为你推荐
书名页
版权页
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Anchor Bolt and Base plate
3.1 Equipment Foundation Construction
3.2 Inspection and Acceptance of Equipment Foundation
3.3 Erection of Anchor Bolts
3.4 Inspection and Acceptance of Anchor Bolts
3.5 Erection of Base Plates
3.6 Inspection and Acceptance of Base Plates
4 Equipment and Materials Mobilization
4.1 General Requirements
4.2 Inspection and Acceptance of Equipment and Materials
5 Shearing Equipment
5.1 Installation of Notcher
5.2 Inspection and Acceptance of Notcher
5.3 Installation of Disc Shear
5.4 Inspection and Acceptance of Disc Shear
5.5 Installation of Cross-Cut Shear
5.6 Inspection and Acceptance of Cross-Cut Shear
5.7 Test-run of Shearing Equipment
6 Strip Connection Equipment
6.1 Installation of Stitcher
6.2 Inspection and Acceptance of Stitcher
6.3 Installation of Laser Welder
6.4 Inspection and Acceptance of Laser Welder
6.5 Installation of Narrow Lap Welder
6.6 Inspection and Acceptance of Narrow Lap Welder
6.7 Test-run of Strip Connection Equipment
7 Strip Surface Preparation Equipment
7.1 Installation of Shot Blaster
7.2 Inspection and Acceptance of Shot Blaster
7.3 Installation of Roller
7.4 Inspection and Acceptance of Roller
7.5 Installation of Strip Dryer
7.6 Inspection and Acceptance of Strip Dryer
7.7 Installation of Oiler
7.8 Inspection and Acceptance of Oiler
7.9 Installation of Coater
7.10 Inspection and Acceptance of Coater
7.11 Test-run of Strip Surface Preparation Equipment
8 Horizontal Continuous Annealing Furnace
8.1 Erection of Furnace Steel Platform
8.2 Inspection and Acceptance of Furnace Steel Platform
8.3 Erection of Furnace Chamber
8.4 Inspection and Acceptance of Furnace Chamber
8.5 Installation of Furnace Equipment
8.6 Inspection and Acceptance of Furnace Equipment
8.7 Furnace Air Tightness Test
8.8 Test-run of Horizontal Continuous Annealing Furnace
9 Baking Furnace
9.1 Erection of Steel Platform
9.2 Inspection and Acceptance of Baking Furnace Steel Platform
9.3 Erection of Furnace Chamber
9.4 Inspection and Acceptance of Furnace Chamber
9.5 Installation of Furnace Equipment
9.6 Inspection and Acceptance of Furnace Equipment
9.7 Test-run of Baking Furnaces
10 Rotary Annealing Furnace
10.1 Installation of Backup Roller and Guide Rollers
10.2 Inspection and Acceptance of Backup Rollers and Guide Rollers
10.3 Installation of Furnace Steel Structure
10.4 Inspection and Acceptance of Furnace Steel Structure
10.5 Installation of Lower Trolley
10.6 Inspection and Acceptance of Lower Trolley
10.7 Erection of Rotating Steel Platform
10.8 Inspection and Acceptance of Rotating Steel Platform
10.9 Erection of Furnace Shell
10.10 Inspection and Acceptance of Furnace Shell
10.11 Erection of Upper Trolley
10.12 Installation of Furnace Door
10.13 Inspection and Acceptance of Furnace Door
10.14 Test-run of Rotary Annealing Furnace
11 Safety and Environmental Protection
11.1 Safety
11.2 Environmental Protection
Appendix A Classification Table of Subproject and Sub-divisional Work for Grain-oriented Silicon Steel Production Line Engineering Equipment Installation
Appendix B Quality Acceptance Record for Sub-divisional Work of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
Appendix C Quality Acceptance Record for Subproject of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
Appendix D Quality Acceptance Record for Unit Work of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
Appendix E Non-load Test-run Record for Grain-Oriented Silicon Steel Production Line Engineering Equipment
Explanation of Wording in This Code
List of Quoted Standards
Explanation of Provisions
Explanation for Formulation of This Code
1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Anchor Bolt and Base Plate
3.1 Equipment Foundation Construction
3.2 Inspection and Acceptance of Equipment Foundation
3.3 Erection of Anchor Bolts
3.4 Inspection and Acceptance of Anchor Bolts
3.5 Erection of Base Plates
3.6 Inspection and Acceptance of Base Plates
4 Equipment and Materials Mobilization
4.1 General Requirements
4.2 Inspection and Acceptance of Equipment and Materials
6 Strip Connection Equipment
6.3 Installation of Laser Welder
6.5 Installation of Narrow Lap Welder
7 Strip Surface Treatment Equipment
7.9 Installation of Coater
8 Horizontal Continuous Annealing Furnace
8.3 Erection of Furnace Chamber
8.7 Furnace Air Tightness Test
10 Rotary Annealing Furnace
10.1 Installation of Backup Rollers and Guide Rollers
10.3 Installation of Furnace Steel Structure
10.9 Erection of Furnace Shell
10.11 Erection of Upper Trolley
11 Safety and Environmental Protection
11.1 Safety
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜