为你推荐
书名页
版权页
Forewords
1 Scope
2 Normative References
3 Terminology
3.1 Power Transformer
3.2 Oil-immersed Type Transformer
3.3 Converter Transformer
3.4 Reactor
3.5 Smoothing Reactor
3.6 Thyristor Valve
3.7 Converter Valves
3.8 Valve Cooling System
3.9 Instrument Transformer
3.10 Current Transformer
3.11 Direct Current Transducer(DCCT)
3.12 Optical Current Transformer
3.13 Voltage Transformer
3.14 Direct Voltage Divider
3.15 Capacitor
3.16 Capacitor Bank
3.17 Circuit Breaker
3.18 Disconnector
3.19 GIS(Gas Insulated Switchgear)
3.20 HGIS(Hybrid Switchgear)
3.21 Earthing Conductor
3.22 Earth-termination system
3.23 Earthing
3.24 Earthing Resistance
3.25 Concentrated Earth-termination system
3.26 Protective earthing
3.27 Earth electrode
3.28 Earthing Grid
3.29 Step Potential Difference
3.30 Touch Potential Difference
3.31 Equal potential Bonding
3.32 Equal potential Bounding Conductor
3.33 Earthing Electrode Cadweld
4 General Provisions
5 Thyristor Converter Valves
5.1 General Requirements
5.2 Requirements for Valve Halls
5.3 Installation Apparatuses and Tools
5.4 Inspection and Safekeeping Prior to Installation
5.5 Installation of Converter Valves
5.6 Optical Cable Laying
5.7 Checking and Test
5.8 Hand-over and Acceptance
6 Water Cooling System of Converter Valves
6.1 General Provisions
6.2 Checking and Safekeeping Prior to Installation
6.3 Installation of Internal Water Cooling System
6.4 Installation of External Water Cooling System
6.5 Check and Test
6.6 Handover and Acceptance
7 Converter Transformer and Oil-immersed Smoothing Reactor
7.1 General Requirements
7.2 Loading,Unloading,and Transportation
7.3 Inspection and Storage Prior to Installation
7.4 Nitrogen Discharge and Internal Check
7.5 Installation of the Proper and Accessories
7.6 Vacuum-pumping of the Proper
7.7 Oil Filling under Vacuum
7.8 Hot Oil Circulation
7.9 Overall Airtightness Checking
7.10 Keeping Still and Electrical Tests
7.11 Moving in Place within Station
7.12 Hand-over and Acceptance
8 AC and DC Filters(including AC high-voltage shunt capacitor banks)
8.1 General Requirements
8.2 Foundations,Anchor Bolts,and Suspension Structures
8.3 Check Prior to Installation
8.4 Installation of Capacitor Banks
8.5 Installation of Auxiliary Devices
8.6 Connection and Checking
8.7 Electrical Tests
8.8 Hand-over and Acceptance
9 DC Switchgears
9.1 General Requirements
9.2 Inspection and Safekeeping Prior to Installation
9.3 Installation of Insulation Platform
9.4 Installation of Breakers
9.5 Installation of Auxiliary Devices of DC Switchgear
9.6 Hand-over and Acceptance
10 DC Wall Bushings
10.1 General Provisions
10.2 Inspection and Safekeeping Prior to Installation
10.3 Installation and Test of Bushings
10.4 Hand-over and Acceptance
11 Dry Reactor
11.1 General Requirements
11.2 Foundations and Supports
11.3 Inspection and Safekeeping Prior to Installation
11.4 Installation and Test of Reactors
11.5 Hand-over and Acceptance
12 Air Conditioning and Ventilation System
12.1 General Requirements
12.2 Inspection and Safekeeping Prior to Installation
12.3 Installation of Indoor and Outdoor Air Conditioning Units
12.4 Installation of Ventilation Equipment
12.5 System Commissioning
12.6 Hand-over and Acceptance
13 Fire Protection System
13.1 General Requirements
13.2 Hand-over and Acceptance
14 Voltage and Current Measuring Devices and Surge Arrester
14.1 General Requirements
14.2 Inspection and Safekeeping Prior to Installation
14.3 Foundations and Supports
14.4 Installation and Test of DC Voltage Dividers and DC Current Transducers
14.5 Installation and Test of Capacitor Voltage Transformers
14.6 Installation and Test of Current Transformers
14.7 Installation and Test of Optical Current Transformers
14.8 Installation and Test of AC and DC Surge Arresters
14.9 Hand-over and Acceptance
15 Open Type Breaker,Composite Switchgear,Disconnector,and Grounding Switch
15.1 General Provisions
15.2 Hand-over and Acceptance
16 Gas Insulated Switchgear
16.1 General Provisions
16.2 Hand-over and Acceptance
17 Power Transformer and Oil Immersed High-voltage Shunt Reactor
17.1 General Provisions
17.2 Hand-over and Acceptance
18 Busbars and Connecting Wires
18.1 General Requirements
18.2 Hand-over and Acceptance
19 Installation of Boards and Cabinets,and Secondary Wiring
19.1 General Requirements
19.2 Hand-over and Acceptance
20 Auxiliary Power System of Converter Station
20.1 General Requirements
20.2 Hand-over and Acceptance
21 Communication and Monitoring Equipment
21.1 General Requirements
21.2 Hand-over and Acceptance
22 Outdoor Lighting
22.1 General Requirements
22.2 Hand-over and Acceptance
23 Fire Stopping of Cables
23.1 General Requirements
23.2 Hand-over and Acceptance
24 Lightening Protection and Grounding
24.1 General Requirements
24.2 Hand-over and Acceptance
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜