万本电子书0元读

万本电子书0元读

顶部广告

GB50830-2013冶金矿山采矿设计规范(英文版)电子书

售       价:¥

16人正在读 | 0人评论 9.8

作       者:中国冶金建设协会

出  版  社:中国计划出版社

出版时间:2016-01-01

字       数:18.0万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
本书是国家标准《冶金矿山采矿设计规范》GB50830-2013的英文版。本规范由住房和城乡建设部第7号公告发布,自2013年10月1日实施。本规范适用于冶金矿山新建、改建和扩建工程的采矿设计。本规范共11章和7个附录,主要内容包括:总则,术语,基本规定,矿山地质,矿山防治水,岩石力学,露天开采,地下开采,矿山机械,井巷工程,矿山安全生产与环境保护。
目录展开

书名页

版权页

Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

Foreword

1 General Provisions

2 Terms

3 Basic Requirements

4 Mining Geology

4.1 General Requirements

4.2 Industrial Index of Mineral Deposit

4.3 Sampling Design for Ore Beneficiation Test

4.4 Resources/Reserves Assessment and Ore Quality Research

4.5 Constructive Prospecting and Productive Prospecting

5 Mining Water Control

5.1 General Requirements

5.2 Calculation of Water Inflow in Open-pit Mine

5.3 Calculation of Water Inflow in Underground Mine

5.4 Waterproof and Drainage of Open-pit Mine

5.5 Waterproof and Drainage of Underground Mine

5.6 Water Control in Mine Surface

5.7 Water Control in Underground Mine

5.8 Mineral Deposit Dewatering

5.9 Anti-seepage Grouting Curtain

6 Rock Mechanics

6.1 General Requirements

6.2 Slope of Open-pit Mine

6.3 Rock Mechanics Design of Underground Mine

7 Open-Pit Mining

7.1 Determination of Open-Pit Limit

7.2 Elements of Open-Pit

7.3 Loss and Dilution of Ores

7.4 Development and Haulage of the Open-pit Mine

7.5 Production Capacity and Production Schedule of Open-pit Mine

7.6 Drilling,Blasting and Loading

7.7 Open-pit Mine Chamber Blasting

7.8 Open-pit Mine Waste Dump

7.9 Transition from Open-pit Mine to Underground Mine

8 Underground Mining

8.1 General Requirements

8.2 Determination of Mining Production Capacity

8.3 Development of Mineral Deposit

8.4 Mining Method

8.5 Mining Equipment

8.6 Construction and Mining Scheduling

8.7 Underground Haulage

8.8 Ventilation and Dust-proof

8.9 Filling Materials Preparation Station and Filling Materials Transportation

9 Mining Machinery

9.1 Vertical Shaft Hoisting

9.2 Inclined Shaft Hoisting

9.3 Compressed Air Facilities

9.4 Drainage Facilities

9.5 Shaft Antifreeze

9.6 Underground Water Supply

9.7 Belt Conveyer and Spreader

9.8 Mine Crushing

10 Shaft Sinking and Drifting

10.1 General Requirements

10.2 Vertical Shaft

10.3 Inclined Shaft

10.4 Drift and Adit

10.5 Draw Shaft and Chute Slipway

10.6 Main Chamber

11 Mining Safety and Environmental Protection

11.1 Mining Safety Technology and Industrial Hygiene

11.2 Mining Environmental Protection

Appendix A Type of Mine Scale and Mine Life

Appendix B Empirical Value of Surface Runoff Coefficient

Appendix C Reference Value of Design Frequency Rain Permeability Coefficient in Subsidence Area

Appendix D Index for Ore Loss and Dilution

Appendix E Table of the Main Excavating Equipment in Underground Mine

Appendix F Relationships Among Horizontal Transportation Quantity,Electric Locomotive Adhesive Weight,Mining Truck Volume,Gauge,Track Type

Appendix G Standard of Underground Water Supply Quality

Explanation of Wording in This Code

累计评论(0条) 0个书友正在讨论这本书 发表评论

发表评论

发表评论,分享你的想法吧!

买过这本书的人还买过

读了这本书的人还在读

回顶部