GB50612-2010冶金矿山选矿厂工艺设计规范(英文版)电子书

售       价:¥

14人正在读 | 0人评论 9.8

作       者:住房和城乡建设部

出  版  社:中国计划出版社

出版时间:2016-02-01

字       数:7.0万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
中华人民共和国住房和城乡建设部公告第661号关于发布国家标准《冶金矿山选矿厂工艺设计规范》的公告现批准《冶金矿山选矿厂工艺设计规范》为国家标准,编号为GB50612-2010,自2011年2月1日起实施。其中,第11.3.1(5)、13.3.3条(款)为强制性条文,必须严格执行。本规范由我部标准定额研究所组织中国计划出版社出版发行。
目录展开

书名页

版权页

Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

Foreword

1 General Provision

2 Terms

3 Basic Requirement

4 Mineral Processing Experiments

4.1 Representativeness of Samples

4.2 Mineral Processing Experiments

5 Scale,Working System and Availability of Equipment

5.1 Scale

5.2 Working System and Availability of Equipment

6 Plant Siting

7 Technology Process

7.1 General Requirement

7.2 Crushing and Screening Flow Sheet

7.3 Grinding and Classification Flow Sheet

7.4 Separating Flow

7.5 Dewatering Separation

8 Selection of Main Equipment

8.1 General Requirements

8.2 Crushing and Screening Equipment

8.3 Grinding and Classification Equipment

8.4 Separating Equipments

8.5 Dehydrate Equipment

9 Workshop Layout and Workshop Equipment Collocation

9.1 Workshop Layout

9.2 Workshop Equipment Collocation

10 Establishment of Mine Storing

11 Establishment of Auxiliary Production

11.1 Feeding,Discharging and Material Handling Facilities

11.2 Maintenance and Repair Facilities

11.3 Reagent Facilities

11.4 Autocontrol,Checking and Measure

11.5 Test and Assay Laboratories

12 Comprehensive Utilization

12.1 Principle of Comprehensive Utilization

12.2 Examination of Comprehensive Utilization

13 Safety and Environmental Protection

13.1 Labor Safety

13.2 Industrial Health

13.3 Environmental Protection

Explanation of Wording in This Code

Explanation of provisions

Explanation of development

3 Basic Requirement

4 Mineral Processing Experiments

4.2 Mineral Processing Experiments

5 Scale,Working System and Availability of Equipment

5.2 Working System and Availability of Equipment

6 Plant Siting

7 Technology Process

7.1 General Requirement

7.2 Crushing and Screening Flow Sheet

7.3 Grinding and Classification Flow Sheet

7.4 Separating Flow

8 Selection of Main Equipment

8.2 Crushing and Screening Equipment

8.3 Grinding and Classification Equipment

8.5 Dehydrate Equipment

9 Workshop Layout and Workshop Equipment Collocation

9.2 Workshop Equipment Collocation

11 Establishment of Auxiliary Production

11.3 Reagent Facilities

12 Comprehensive Utilization

12.2 Examination of Comprehensive Utilization

13 Safety and Environmental Protection

13.1 Labor Safety

13.3 Environmental Protection