为你推荐
书名页
版权页
Foreword
1 General Principles
2 Basic Regulation
2.1 General Provision
2.2 Equipment Unpacking and Storage
2.3 Construction Preparation
3 Installation of Sampling ﹠ Sensitive Element
3.1 General Provision
3.2 Temperature
3.3 Pressure
3.4 Flow
3.5 Level
3.6 Analysis
3.7 Special Instruments
3.8 Weighing
3.9 Others
4 Installation of Local Measuring ﹠ Control Instrument
4.1 General Provision
4.2 Pressure ﹠ Differential Pressure Indicating Instrument ﹠ Transmitter
4.3 Switch Instrument
4.4 Analysis Instrument
4.5 Actuator
5 Installation of Control Panel(Console,Box,Cabinet)
5.1 Installation of Control Panel
5.2 Installation of Instrument ﹠ Equipment on Panel
5.3 Installation of Computer and Its Auxiliary System
6 Laying and Wiring of Wires and Cables
6.1 General Provision
6.2 Installation of Cable Conduit
6.3 Installation of Cable Support,Hanger,Bridge
6.4 Laying and Fixing of Wire and Cable
6.5 Wiring
7 Pipe
7.1 General Provision
7.2 Pipe Bending and Connecting
7.3 Conduit Fixing
8 Protection and Grounding
8.1 Explosion-proof and Fireproof
8.2 Anti-freezing
8.3 Anticorrosion
8.4 Grounding
9 I﹠C Device Commissioning
9.1 General Provision
9.2 Instrument ﹠ Alarming Device Commissioning
9.3 Instrument Pipe ﹠ Circuit Commissioning
9.4 Pre-trial-running Conditions
9.5 List of Documents
Appendix A Pipe ﹠ Valve Sealing Test Criteria
Appendix B Selection of Gasket Material
Appenuix C Shortest Straight Pipe Section Length Required by Orifice Plate,Nozzle and Venturi Nozzle
Appendix D Computer Signal Classification ﹠ Cable Selection
Appendix E Minimum Distance between Signal Cable and Power Cable
Appendix F Material ﹠ Caliber Selection for Instrument pipe
Appendix G Physical ﹠ Chemical Properties of Commonly Used Isolation Liquid
Explanation of Wording in This Specification
List of Quoted Standards
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜