1 Scope
2 Normative References
3 General Provisions
3.1 General Requirements
3.2 Basic Requirements for the Machine Train Construction
4 Preparations for Construction
4.1 Technical Preparations
4.2 Site Preparations
4.3 Unpacking Inspection
4.4 Foundation Inspection,Re-measurement and Surface Treatment
5 Overall Installation of the Machine Train
5.1 Installation of Supporting Plates and Shims
5.2 Installation of Baseplate in Position
5.3 Installation of the Machine Train in Position
5.4 Shaft End-to-end Distance Confirmation and Shaft Alignment
5.5 The Machine Train Grouting
5.6 Coupling Assembly
6 Gearbox Assembly
7 Axial Compressor Assembly
7.1 Assembling Procedure
7.2 Axial Compressor with Bearing House and Casing Separated
7.3 Axial Compressor with Bearing House and Casing Integrated
8 Assembly and Examination of Expander
8.1 Examination Prior to Expander Assembly
8.2 Assembly of Expander
9 Assembly of Motor/Generator
10 Auxiliary Facility and Piping Installation
10.1 Auxiliary Facility Installation
10.2 Piping Connection
10.3 Oil System Flushing
11 Running Test of the Machine Train
11.1 Preparations for Running Test
11.2 Running Test of Oil System
11.3 Mechanical Running Test of the Motor and Generator
11.4 Mechanical Running Test of Gearbox
11.5 Mechanical Running Test of Axial Compressor
11.6 Mechanical Running Test of Expander
12 Technical Documents of Construction Completion
Appendix A(Informative)Technical Characteristics of the Machine Train
Appendix B(Informative)Mono-indicator Alignment
Explanation of Wording in This Code
Explanation of Provisions
Revision Explanation
1 Scope
3 General Provisions
3.2 Basic Requirements for the Machine Train Construction
4 Preparations for Construction
4.1 Technical Preparations
4.2 Site Preparations
4.3 Unpacking Inspection
4.4 Foundation Inspection,Re-measurement and Surface Treatment
5 Overall Installation of the Machine Train
5.4 Shaft End-to-end Distance Confirmation and Shaft Alignment
6 Gearbox Assembly
7 Axial Compressor Assembly
7.1 Assembling Procedure
7.2 Axial Compressor with Bearing House and Casing Separated
8 Assembly and Examination of Expander
8.1 Examination Prior to Expander Assembly
8.2 Assembly of Expander
9 Assembly of Motor/Generator
10 Auxiliary Facility and Piping Installation
10.1 Auxiliary Facility Installation
11 Running Test of the Machine Train
11.1 Preparations for Running Test
11.3 Mechanical Running Test of the Motor and Generator
11.6 Mechanical Running Test of Expander
Appendix A(Informative)Technical Characteristics of the Machine Train