为你推荐
书名页
版权页
中华人民共和国住房和城乡建设部公告
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General
2 Terms
3 Basic Requirements
4 Heating(Cooling)and Electrical Load
4.1 Heating(Cooling)Load and Heating(Cooling)Medium
4.2 Electrical Load
5 Siting
6 Overall Planning
6.1 General Requirements
6.2 Planning of Plant Area
6.3 Off-site Planning
7 Main Power Building Arrangement
7.1 General Requirements
7.2 Main Power Building Arrangement
7.3 Maintenance and Repair Facilities
7.4 Integrated Facilities
8 Coal Handling System
8.1 General Requirements
8.2 Coal Unloading Facilities and Off-site Transportation
8.3 Belt Conveyor System
8.4 Coal Yard and Relevant Facilities
8.5 Screen and Coal Crusher
8.6 Limestone Storage and Pulverizing System
8.7 Coal Handling Control Mode
8.8 Coal Handling Auxiliary Facilities and Ancillary Buildings
9 Boiler Equipment and System
9.1 Boiler Equipment
9.2 Coal Pulverizing System
9.3 Flue Gas and Air System
9.4 Ignition and Combustion Supporting Oil System
9.5 Boiler Auxiliary System and Associated Equipment
9.6 Startup Boiler
10 Ash Handling System
10.1 General Requirements
10.2 Hydraulic Ash Handling System
10.3 Mechanical Bottom Ash Handling System
10.4 Dry Fly Ash Handling System
10.5 Off-site Ash Transportation System
10.6 Control and Maintenance Facilities
10.7 Ash Handling System for CFB Boiler
11 Flue Gas Desulfurization System
12 DeNOx System
13 Steam Turbine Equipment and System
13.1 Steam Turbine Equipment
13.2 Main Steam System and Heat Supplying Steam System
13.3 Feedwater System and Feedwater Pump
13.4 Deaerator and Feedwater Tank
13.5 Condensate System and Condensate Pump
13.6 Drain Pump of Low-pressure Heater
13.7 Drain Flash Tank,Drain Tank,Drain Pump,Low-level Water Tank,and Low-level Water Pump
13.8 Service Water System
13.9 District Heating System Heater and System
13.10 Temperature and Pressure Reducing Devices
13.11 Condensate Recovery Device for Steam Network
13.12 Condenser and Its Auxiliary Facilities
14 Water Treatment Equipment and System
14.1 Water Pretreatment System
14.2 Water Pre-desalination System
14.3 Boiler Makeup Water Treatment System
14.4 Chemical Dosing and Water-Steam Sampling of Thermodynamic System
14.5 Cooling Water Treatment
14.6 Water Treatment System for District Heating System Makeup Water and Industrial Return Water
14.7 Chemicals Storage and Solution Tank
14.8 Design and Anticorrosion of Tanks,Channels,Pipes,and Valves
14.9 Chemical Laboratory and Instruments
15 Information System
15.1 General Requirements
15.2 Overall Planning of Plant Information System
15.3 Management Information System
15.4 Price Bidding System
15.5 Video Monitoring System
15.6 Access Guard Management System
15.7 Cabling
15.8 Information Security
16 Instrumentation and Control
16.1 General Requirements
16.2 Control Mode and Automation Level
16.3 Arrangement of Control Room and Electrical Equipment Room
16.4 Measurement and Instrumentation
16.5 Modulating Control
16.6 On-off Control and Interlocking
16.7 Alarm
16.8 Protection
16.9 Control System
16.10 Control Power Supply
16.11 Arrangement of Cables,Instrument Conduits,and Local Equipment
16.12 Instrumentation and Control Laboratory
17 Electrical Equipment and System
17.1 Generator and Main Transformer
17.2 Main Electrical Connection
17.3 AC Auxiliary Power System
17.4 HV Switchgears
17.5 DC Power Supply System and AC UPS
17.6 Electrical Supervisory and Control
17.7 Electrical Measuring Devices
17.8 Relaying Protection and Automatic Safety Devices
17.9 Lighting System
17.10 Selection and Laying of Cables
17.11 Overvoltage Protection and Grounding
17.12 Electrical Laboratory
17.13 Electrical Installations in Areas with Fire and Explosion Hazards
17.14 Inner Communication
17.15 Power System Protection
17.16 System Communication
17.17 Remote Control
17.18 Energy Metering
18 Hydraulic Facilities and Systems
18.1 Water Source and Water Balance Management
18.2 Water Supply System
18.3 Water Intake Structure and Pump House
18.4 Delivery Pipeline,Culvert and Channel
18.5 Cooling Facilities
18.6 External Ash Handling System and Ash Yard
18.7 Water Supply and Drainage
18.8 Hydraulic Buildings(Structures)
19 Auxiliary and Ancillary Facilities
20 Architecture and Structure
20.1 General Requirements
20.2 Seismic Design
20.3 Structure of the Main Building
20.4 Subgrade and Foundation
20.5 Daylighting and Natural Ventilation
20.6 Thermal Engineering and Noise Control in Buildings
20.7 Water Proofing and Drainage
20.8 Indoor and Outdoor Decoration
20.9 Door and Window
20.10 Living Facilities
20.11 Chimney
20.12 Coal Conveying Structures
20.13 Supporting Structure of Air Cooled Condenser
20.14 Live Loads
21 Heating,Ventilation and Air Conditioning
21.1 General Requirements
21.2 Main Power Building
21.3 Electrical Buildings and Electrical Equipment
21.4 Coal Handling Building
21.5 Chemical Building
21.6 Other Auxiliary and Accessory Buildings
21.7 Refrigerating Station,Heating Station,and Piping Network in the Plant Area
22 Environmental Protection and Soil and Water Conservation
22.1 General Requirements
22.2 Design Requirements for Environmental Protection and Soil and Water Conservation
22.3 Principle for Treatment of Pollution Sources
22.4 Environmental Management and Monitoring
22.5 Soil and Water Conservation
23 Labor Safety and Occupational Health
23.1 General Requirements
23.2 Labor Safety
23.3 Occupational Health
24 Fire Protection
Appendix A Total Water Quality Analysis Report
Explanation of Wording in This Code
List of Quoted Standards
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜