万本电子书0元读

万本电子书0元读

顶部广告

GB51105-2015挤压钢管工程设备安装与验收规范(英文版)电子书

售       价:¥

4人正在读 | 0人评论 9.8

作       者:中国冶金建设协会

出  版  社:中国计划出版社

出版时间:2019-04-01

字       数:8.6万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
本书是《挤压钢管工程设备安装与验收规范》GB51105-2015的英文版,由中华人民共和国住房和城乡建设部组织编译。本书共分11章,主要技术内容包括:总则,基本规定,设备基础、地脚螺栓和垫板,设备及材料进场,管坯准备段设备,穿/扩孔机,挤压机,挤压线辅助设备,环形加热炉,精整线设备,安全及环保。本书适用于挤压钢管工程设备安装及质量验收。
目录展开

Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

Foreword

1 General Provisions

2 Basic Requirements

3 Equipment Foundation,Anchor Bolt and Base Plate

3.1 Equipment Foundation Construction

3.2 Inspection and Acceptance of Equipment Foundation

3.3 Erection of Anchor Bolts

3.4 Inspection and Acceptance of Anchor Bolts

3.5 Erection of Base Plates

3.6 Inspection and Acceptance of Base Plates

4 Equipment and Materials Mobilization

4.1 General Requirements

4.2 Inspection and Acceptance of Equipment and Materials

5 Equipment of Pipe Billet Preparation Section

5.1 Installation of Short/Long Band Sawing Machine

5.2 Inspection and Acceptance of Short/Long Band Sawing Machine

5.3 Installation of Peeler

5.4 Inspection and Acceptance of Peeler

5.5 Installation of Facing Machine

5.6 Inspection and Acceptance of Facing Machine

5.7 Installation of Center Hole Drilling Machine

5.8 Inspection and Acceptance of Center Hole Drilling Machine

5.9 Installation of Deep Hole Drilling Machine

5.10 Inspection and Acceptance of Deep Hole Drilling Machine

5.11 Test-run of Equipment of Pipe Billet Preparation Section

6 Punching and Expanding Press

6.1 Installation of Base

6.2 Inspection and Acceptance of Base

6.3 Installation of Machine Frame

6.4 Inspection and Acceptance of Machine Frame

6.5 Installation of Upsetting Beam/Piercing Beam

6.6 Inspection and Acceptance of Upsetting Beam/Piercing Beam

6.7 Installation of Container

6.8 Inspection and Acceptance of Expanding Container

6.9 Installation of Manipulator

6.10 Inspection and Acceptance of Manipulator

6.11 Installation of Glass Powder Lubrication Table

6.12 Inspection and Acceptance of Glass Powder Lubrication Table

6.13 Test-run of Punching and Expanding Press

7 Extrusion Press

7.1 Installation of Base Board

7.2 Inspection and Acceptance of Base Board

7.3 Installation of Front and Back Beams

7.4 Inspection and Acceptance of Front and Back Beams

7.5 Installation of Pre-tensioned Column

7.6 Inspection and Acceptance of Pre-tensioned Column

7.7 Installation of Extrusion Beam

7.8 Inspection and Acceptance of Extrusion Beam

7.9 Installation of Piercing Beam

7.10 Inspection and Acceptance of Piercing Beam

7.11 Installation of Container

7.12 Inspection and Acceptance of Extrusion Container

7.13 Installation of Manipulator

7.14 Inspection and Acceptance of Manipulator

7.15 Installation of Main Hydraulic Cylinder

7.16 Inspection and Acceptance of Main Hydraulic Cylinder

7.17 Installation of Glass Powder Lubrication Table

7.18 Inspection and Acceptance of Glass Powder Lubrication Table

7.19 Test-run of Extrusion Press

8 Auxiliary Equipment of Extrusion Line

8.1 Installation of Charging Unit and Pipe Billet Cleaning Unit

8.2 Inspection and Acceptance of Charging Unit and Pipe Billet Cleaning Unit

8.3 Installation of Conveying Roller Table

8.4 Inspection and Acceptance of Conveying Roller Table

8.5 Inspection of Induction Heating Furnace

8.6 Inspection and Acceptance of Induction Heating Furnace

8.7 Installation of High-pressure Descaling Unit

8.8 Inspection and Acceptance of High-pressure Descaling Unit

8.9 Installation of Quenching Tank

8.10 Inspection and Acceptance of Quenching Tank

8.11 Installation of Chain Type Cooling Bed

8.12 Inspection and Acceptance of Chain Type Cooling Bed

8.13 Test-run of Auxiliary Equipment of Extrusion Line

9 Rotary Heating Furnace

9.1 Installation of Furnace Steel Structure

9.2 Inspection and Acceptance of Furnace Steel Structure

9.3 Installation of Feeding and Tapping Roller Table

9.4 Inspection and Acceptance of Feeding and Tapping Roller Table

9.5 Installation of Backup Rollers and Guide Rollers

9.6 Inspection and Acceptance of Backup Rollers and Guide Rollers

9.7 Erection of Rotating Steel Platform

9.8 Inspection and Acceptance of Rotating Steel Platform

9.9 Installation of Trolley

9.10 Inspection and Acceptance of Trolley

9.11 Erection of Furnace Shell

9.12 Inspection and Acceptance of Furnace Shell

9.13 Installation of Furnace Door and Lifting Units

9.14 Inspection and Acceptance of Furnace Door and Lifting Units

9.15 Test-run of Rotary Heating Furnace

10 Finishing Line Equipment

10.1 Installation of Pressure Straightener

10.2 Inspection and Acceptance of Pressure Straightener

10.3 Installation of Inclined Roller Straightener

10.4 Inspection and Acceptance of Inclined Roller Straightener

10.5 Installation of Pipe Cutting Band Sawing Machine

10.6 Inspection and Acceptance of Pipe Cutting Band Sawing Machine

10.7 Installation of Shot Blasting Machine

10.8 Inspection and Acceptance of Shot Blasting Machine

10.9 Installation of Tube Rolling Mill

10.10 Inspection and Acceptance of Tube Rolling Mill

10.11 Installation of Measuring and Weighing Marking Device

10.12 Inspection and Acceptance of Measuring and Weighing Marking Device

10.13 Installation of Ultrasonic Flaw-detecting Device

10.14 Inspection and Acceptance of Ultrasonic Flaw-detecting Device

10.15 Installation of Eddy Flaw-detecting Device

10.16 Inspection and Acceptance of Eddy Flaw-detecting Device

10.17 Installation of Steel Pipe Exterior Surface Polisher

10.18 Inspection and Acceptance of Steel Pipe Exterior Surface Polisher

10.19 Installation of Roller-hearth Solution Heat Furnace

10.20 Inspection and Acceptance of Roller-hearth Solution Heat Furnace

10.21 Test-run of Finishing Line Equipment

11 Safety and Environmental Protection

11.1 Safety

11.2 Environmental Protection

Appendix A Classification Table of Subproject and Sub-divisional Work for Extrusion Steel Pipe Production Line Engineering Equipment Installation

Appendix B Quality Acceptance Record for Sub-divisional Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation

Appendix C Quality Acceptance Record for Subproject of Extrusion Steel Pipe Production Line Engineering Equipment Installation

Appendix D Quality Acceptance Record for Unit Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation

Appendix E Non-load Test-run Record for Extrusion Steel Pipe Production Line Engineering Equipment

Explanation of Wording in This Code

List of Quoted Standards

累计评论(0条) 0个书友正在讨论这本书 发表评论

发表评论

发表评论,分享你的想法吧!

买过这本书的人还买过

读了这本书的人还在读

回顶部