为你推荐
书名页
版权页
Announcement of Ministry of Construction of the People's Republic of China
Foreword
1 General Provisions
2 Steam Turbine Generator and Synchronous Var Compensator
2.1 General Requirement
2.2 Safekeeping,Transportation and Lifting
2.3 Installation of Stator and Rotor
2.4 Installation of Collector Ring and Electric Brush
2.5 Hydrogen-cooled Generator
2.6 Internal Water-cooled Generator
2.7 Drying
3 Electric Motor
3.1 General Requirement
3.2 Safekeeping and Lifting
3.3 Inspection and Installation
4 Transfer and Acceptance
Explanation of Wording in This Code
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜