为你推荐
书名页
版权页
Announcement of Ministry of Construetion of the People’s Republic of China
Foreword
1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Anchor Bolt and Shim
3.1 General Requirements
3.2 Equipment Foundation
3.3 Anchor Bolt
3.4 Shim
4 Equipment and Material Mobilization
4.1 General Requirements
4.2 Equipment
4.3 Raw Materials
5 Equipment Installation
5.1 General Requirements
5.2 Installation of Oil Tank
5.3 Installation of Cooler and Steam Heater
5.4 Installation of Filter
5.5 Installation of Accumulator
5.6 Installation of Pump
5.7 Installation of a Complete Set of Hydraulic(Lubrication)Station
5.8 Installation of Valve Stand for Hydraulic(Gas)Valve and Control Valve
5.9 Installation of Oil Purifier
5.10 Installation of Oil Filler and Distributor
5.11 Installation of Water-separating Gas Filter,Atomized Lubricator(Oil Separator)and Control Valve
6 Pipe Fabrication and Installation
6.1 General Requirements
6.2 Pipe Welding
6.3 Pipe Pickling
6.4 Pipe Fabrication
6.5 Pipe Installation
7 Pipe Flushing,Purging and Pressure test
7.1 General Requirements
7.2 Pipe Flushing
7.3 Pipe Purging
7.4 Pressure Test of Pipe for Hydraulic and Lubrication Oil Systems
7.5 Pressure Test of Pipe for Lubrication Grease System
7.6 Pressure Test of Pipe for Pneumatic System
8 Commissioning and Test Run
8.1 General Requirements
8.2 Commissioning and Test Run of Hydraulic Equipment
8.3 Commissioning and Test Run of Lubrication Oil Equipment
8.4 Commissioning and Test Run of Lubrication Grease Equipment
8.5 Commissioning and Test Run of Oil Mist Lubrication Equipment
8.6 Commissioning and Test Run of Process Lubrication Equipment
8.7 Commissioning and Test Run of Pneumatic Equipment
Appendix A Record of Quality Acceptance of Subdivisional Works of Installation of Metallurgical Mechanical Hydraulic,Lubrication and Pneumatic Equipment
Appendix B Record of Quality Acceptance of Sub-unit Works of Installation of Metallurgical Mechanical Hydraulic,Lubrication and Pneumatic Equipment
Appendix C Record of Quality Acceptance of Unit Works of Installation of Metallurgical Mechanical Hydraulic,Lubrication and Pneumatic Equipment
Appendix D Record of Commissioning and Test Run of Metallurgical Mechanical Hydraulic,Lubrication and Pneumatic Equipment
Appendix E Record of No-load Combined Test Run of Metallurgical Mechanical Hydraulic,Lubrication and Pneumatic Equipment
Appendix F Hydraulic Fluid Power-Fluids-Method for Coding the Level of Contamination by Solid Particles(from the national standard GB/T 14039-2002)
Explanation of Wording in This Code
Explanation of Provisions
1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Anchor Bolt and Shim
3.1 General Requirements
3.2 Equipment Foundation
3.3 Anchor Bolt
4 Equipment and Material Mobilization
4.1 General Requirements
4.2 Equipment
4.3 Raw Materials
5 Equipment Installation
5.1 General Requirements
5.3 Installation of Cooler and Steam Heater
6 Pipe Fabrication and Installation
6.2 Pipe Welding
6.3 Pipe Pickling
6.4 Pipe Fabrication
6.5 Pipe Installation
7 Pipe Flushing,Purging and Pressure test
7.2 Pipe Flushing
7.5 Pressure Test of Pipe for Lubrication Grease System
7.6 Pressure Test of Pipe for Pneumatic System
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜