万本电子书0元读

万本电子书0元读

顶部广告

DL/T5418-2009火电厂烟气脱硫吸收塔施工及验收规程(英文版)电子书

售       价:¥

11人正在读 | 0人评论 9.8

作       者:中国电力企业

出  版  社:中国计划出版社

出版时间:2015-06-01

字       数:10.5万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
本书为中华人民共和国电力行业标准,由住房城乡建设部组织翻译的英文版,用于对外交流和国内对外的合作。中文版已于2009年出版。本标准规定了火电厂湿法烟气脱硫装置中吸收塔施工及验收的技术要求。本标准适用于火电厂湿法烟气脱硫装置中以普通碳素结构钢为主体结构材料、以玻璃鳞片树脂或橡胶为内防腐衬里的吸收塔施工及验收。吸收塔的范围包括塔壳体、塔内件以及所有焊接在塔外壳体上的附件或结构件。
目录展开

书名页

版权页

Foreword

1 Scope

2 Normative References

3 Terms and Definitions

4 General

5 Acceptance of Materials and Finished Products

5.1 Acceptance of Metal Materials

5.2 Acceptance of Welding Materials

5.3 Acceptance of Non-metal Lining Materials

5.4 Acceptance of Finished Product Accessories

6 Prefabrication

6.1 General

6.2 Prefabrication of Bottom Plates

6.3 Prefabrication of Wall Plates

6.4 Prefabrication of Roof Plates

6.5 Member Prefabrication

6.6 Preassembly

7 Assembly

7.1 General

7.2 Acceptance of Foundation

7.3 Foundation Marking

7.4 Assembly of Base Plates

7.5 Assembly of Wall Plates

7.6 Installation of Stiffener

7.7 Assembly of Roof Plates

7.8 Assembly of Flue Gas Inlets & Outlets

7.9 Assembly of Accessories Welded to the Absorber Body

8 Welding

8.1 Welding Procedure Qualification(WPQ)

8.2 Welder Examination

8.3 Welding Preparations

8.4 Welding Operations

8.5 Recommended Welding Sequence

8.6 Visual Inspection of Welds

8.7 Nondestructive Testing(NDT)and Leak Testing of Welds

8.8 Defect Repairing

9 Acceptance of Absorber Body

9.1 General

9.2 Geometric Shape and Dimensional Inspection of Absorber Body

9.3 Water Filling Test

10 Anticorrosion of Glass Resin Flake

10.1 General

10.2 Matrix Treatment

10.3 Lining Construction

10.4 Lining Inspection

10.5 Repairing

11 Anticorrosion of Rubber Lining

12 Installation of Absorber internals

12.1 General

12.2 Installation of Spraying Banks

12.3 Installation of Mist Eliminator

12.4 Installation of Agitator System

13 Painting and Insulation

14 Acceptance Records

Appendix A(Normative)Preparation and Inspection of T-joint Fillet Weld Specimens

Appendix B(Informative)Handover and Acceptance Table

Article Explanation

1 Scope

2 Normative References

4 General

5 Acceptance of Materials and Finished Products

5.1 Acceptance of Metal Materials

5.2 Acceptance of Welding Materials

5.3 Acceptance of Non-metal Iining Materials

5.4 Acceptance of Finished Product Accessories

6 Prefabrication

6.1 General

6.2 Prefabrication of Bottom Plates

6.3 Prefabrication of Wall Plates

6.4 Prefabrication of Roof Plates

6.5 Member Prefabrication

6.6 Preassembly

7 Assembly

7.1 General

7.2 Acceptance of Foundation

7.3 Foundation Marking

7.4 Assembly of Base Plates

7.5 Assembly of Wall Plates

7.7 Assembly of Roof Plates

7.8 Assembly of Flue Gas Inlets & Outlets

7.9 Assembly of Accessories Welded to the Absorber Body

8 Welding

8.1 Welding Procedure Qualification(WPQ)

8.2 Welder Examination

8.3 Welding Preparation

8.4 Welding Operations

8.5 Recommended Welding Sequence

8.6 Visual Inspection of Welds

8.7 Nondestructive Testing(NDT)and Leak Test of Welds

8.8 Defect Repairing

9 Acceptance of Absorber Body

9.1 General

9.2 Geometric Shape and Dimensional Inspection of Absorber Body

9.3 Water Filling Test

10 Anticorrosion of Glass Resin Flake

10.1 General

10.2 Matrix treatment

10.3 Lining Construction

10.4 Lining Inspection

10.5 Repairing

11 Anticorrosion of Rubber Lining

12 Installation of Absorber Internals

12.1 General

12.2 Installation of Spraying Bank

12.3 Installation of Mist Eliminator

12.4 Installation of Agitator System

13 Painting and Insulation

14 Acceptance Records

累计评论(0条) 0个书友正在讨论这本书 发表评论

发表评论

发表评论,分享你的想法吧!

买过这本书的人还买过

读了这本书的人还在读

回顶部