为你推荐
书名页
版权页
Foreword
1 Scope
2 Normative References
3 Terms and Definitions
4 General
5 Acceptance of Materials and Finished Products
5.1 Acceptance of Metal Materials
5.2 Acceptance of Welding Materials
5.3 Acceptance of Non-metal Lining Materials
5.4 Acceptance of Finished Product Accessories
6 Prefabrication
6.1 General
6.2 Prefabrication of Bottom Plates
6.3 Prefabrication of Wall Plates
6.4 Prefabrication of Roof Plates
6.5 Member Prefabrication
6.6 Preassembly
7 Assembly
7.1 General
7.2 Acceptance of Foundation
7.3 Foundation Marking
7.4 Assembly of Base Plates
7.5 Assembly of Wall Plates
7.6 Installation of Stiffener
7.7 Assembly of Roof Plates
7.8 Assembly of Flue Gas Inlets & Outlets
7.9 Assembly of Accessories Welded to the Absorber Body
8 Welding
8.1 Welding Procedure Qualification(WPQ)
8.2 Welder Examination
8.3 Welding Preparations
8.4 Welding Operations
8.5 Recommended Welding Sequence
8.6 Visual Inspection of Welds
8.7 Nondestructive Testing(NDT)and Leak Testing of Welds
8.8 Defect Repairing
9 Acceptance of Absorber Body
9.1 General
9.2 Geometric Shape and Dimensional Inspection of Absorber Body
9.3 Water Filling Test
10 Anticorrosion of Glass Resin Flake
10.1 General
10.2 Matrix Treatment
10.3 Lining Construction
10.4 Lining Inspection
10.5 Repairing
11 Anticorrosion of Rubber Lining
12 Installation of Absorber internals
12.1 General
12.2 Installation of Spraying Banks
12.3 Installation of Mist Eliminator
12.4 Installation of Agitator System
13 Painting and Insulation
14 Acceptance Records
Appendix A(Normative)Preparation and Inspection of T-joint Fillet Weld Specimens
Appendix B(Informative)Handover and Acceptance Table
Article Explanation
1 Scope
2 Normative References
4 General
5 Acceptance of Materials and Finished Products
5.1 Acceptance of Metal Materials
5.2 Acceptance of Welding Materials
5.3 Acceptance of Non-metal Iining Materials
5.4 Acceptance of Finished Product Accessories
6 Prefabrication
6.1 General
6.2 Prefabrication of Bottom Plates
6.3 Prefabrication of Wall Plates
6.4 Prefabrication of Roof Plates
6.5 Member Prefabrication
6.6 Preassembly
7 Assembly
7.1 General
7.2 Acceptance of Foundation
7.3 Foundation Marking
7.4 Assembly of Base Plates
7.5 Assembly of Wall Plates
7.7 Assembly of Roof Plates
7.8 Assembly of Flue Gas Inlets & Outlets
7.9 Assembly of Accessories Welded to the Absorber Body
8 Welding
8.1 Welding Procedure Qualification(WPQ)
8.2 Welder Examination
8.3 Welding Preparation
8.4 Welding Operations
8.5 Recommended Welding Sequence
8.6 Visual Inspection of Welds
8.7 Nondestructive Testing(NDT)and Leak Test of Welds
8.8 Defect Repairing
9 Acceptance of Absorber Body
9.1 General
9.2 Geometric Shape and Dimensional Inspection of Absorber Body
9.3 Water Filling Test
10 Anticorrosion of Glass Resin Flake
10.1 General
10.2 Matrix treatment
10.3 Lining Construction
10.4 Lining Inspection
10.5 Repairing
11 Anticorrosion of Rubber Lining
12 Installation of Absorber Internals
12.1 General
12.2 Installation of Spraying Bank
12.3 Installation of Mist Eliminator
12.4 Installation of Agitator System
13 Painting and Insulation
14 Acceptance Records
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜