为你推荐
书名页
版权页
Announcement of Ministry of Construction of the People's Republic of China
Foreword
1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Foundation Bolt and Base Plate
3.1 General Requirements
3.2 Equipment Foundation
3.3 Foundation Bolt
3.4 Base Plate
4 Equipment and Material Mobilization
4.1 General Requirements
4.2 Equipment
4.3 Raw Materials
5 Installation of Converter
5.1 General Requirements
5.2 Trunnion Bearing Pedestal
5.3 Backing Ring
5.4 Furnace Body
5.5 Tilting Device
5.6 Removable Guard Board and Fixed Guard Board
6 Installation of Oxygen Lance and Sublance
6.1 General Requirements
6.2 Oxygen Lance,Sublance and Lifting Device
6.3 Cross travelling device
6.4 Rotating Device
6.5 Nitrogen Sealing Device
6.6 Probe Mounting Machine and Pulling Machine
7 Installation of Hood
7.1 General Requirements
7.2 Skirt
7.3 Removable Hood
8 Installation of Waste Heat Boiler(Vaporization Cooling Device)
8.1 General Requirements
8.2 Flue
8.3 Boiler Barrel
8.4 Piping for Steam and Water Systems
8.5 Heat Accumulator
8.6 Deoxidization Water Tank
9 Installation of Electric Arc Furnace
9.1 General Requirements
9.2 Rail Chair
9.3 Cradle
9.4 Tilting Device
9.5 Tilting Locking Device
9.6 Furnace Body
9.7 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
9.8 Electrode Lifting Mechanism and Electrode Clamping Mechanism
9.9 Oxygen Lance
10 Installation of Ladle Refining Furnace(LF)
10.1 General Requirements
10.2 Track for Buggy Ladle
10.3 Buggy Ladle
10.4 Furnace Cover and Furnace Cover Lifting Mechanism
10.5 Electrode Lifting Mechanism and Electrode Clamping Mechanism
10.6 Argon Gas Stirrer
10.7 Temperature Measuring and Sampling Device
11 Installation of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
11.1 General Requirements
11.2 Vacuum Tank
11.3 Track for Vacuum Tank Car
11.4 Vacuum Tank Car
11.5 Vacuum Tank Cap and Tank Cap Lifting Mechanism
11.6 Temperature Measuring and Sampling Device
11.7 Vacuum Device
11.8 Oxygen Lance(Vacuum Oxygen Decarburization Converter(VOD))
12 Installation of Recirculation Vacuum Degassing Refining Furnace(RH)
12.1 General Requirements
12.2 Track for Buggy Ladle
12.3 Buggy Ladle
12.4 Track for Vacuum Degassing Chamber Car
12.5 Vacuum Degassing Chamber and Degassing Chamber Car
12.6 Vacuum Device
12.7 Ladle Lifting Device
12.8 Preheating Device for Vacuum Degassing Chamber
13 Installation of Argon Oxygen Decarburization Refining Furnace(AOD)
13.1 General Requirements
13.2 Trunnion Bearing Pedestal
13.3 Backing Ring
13.4 Furnace Body
13.5 Tilting Device
13.6 Removable Guard Board and Fixed Guard Board
14 Installation of Casting Equipment
14.1 General Requirements
14.2 Ladle Turret
14.3 Tundish Car and Track
14.4 Roaster
15 Installation of Continuous Steel-casting Equipment
15.1 General Requirements
15.2 Mold and Vibrating Device
15.3 Secondary Cooling Device
15.4 Exchange Device for Segment
15.5 Withdrawal and Straightening Unit
15.6 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
15.7 Flame Cutting Machine
15.8 Rocking Shear
15.9 Crop Collecting Device
15.10 Burring Machine
16 Installation of Discharging and Finishing Equipment
16.1 General Requirements
16.2 Conveying Roller Table
16.3 Turntable
16.4 Pusher,Puller and Tilter
16.5 Scarfer
16.6 Lifting Guard Board and Marking Punch
16.7 Cross Travelling Trolley
16.8 Centering Device
17 Installation of Hot Metal Mixer
17.1 General Requirements
17.2 Base and Race
17.3 Furnace Shell and Tension Sleeve
17.4 Tilting Device
17.5 Cover Manipulating Winch
18 Installation of Hot Metal Pretreatment Equipment
18.1 General Requirements
18.2 Desulfurizer(Dephosphorizer)Conveying Device
18.3 Stirring Desulfurization Equipment
18.4 Dephosphorization Spray Gun
18.5 Molten Iron Tank Car
18.6 Track for Molten Iron Tank Car
18.7 Slag remover
19 Installation of Raw Material System
19.1 General Requirements
19.2 Weighing Funnel
19.3 Collecting Funnel and Rotating Funnel
20 Installation of Gas Purification Device
20.1 General Requirements
20.2 Gas Purification Device
21 Test Run of Steel-making Mechanical Equipment
21.1 General Requirements
21.2 Test Run of Converter
21.3 Test Run of Oxygen Lance and Sublance
21.4 Test Run of Hood
21.5 Test Run of Waste Heat Boiler System
21.6 Test Run of Electric Arc Furnace
21.7 Test Run of Ladle Refining Furnace(LF)
21.8 Test Run of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
21.9 Test Run of Recirculation Vacuum Degassing Refining Furnace(RH)
21.10 Test Run of Argon Oxygen Decarburization Refining Furnace(AOD)
21.11 Test Run of Casting equipment
21.12 Test Run of Continuous Steel-casting Equipment
21.13 Test Run of Discharging and Finishing Equipment
21.14 Test Run of Hot Metal Mixer
21.15 Test Run of Hot Metal Pretreatment Equipment
Appendix A Record of Quality Acceptance for Subdivisional Works of Installation of Steel-making Mechanical Equipment
Appendix B Record of Quality Acceptance for Sub-unit Works of Installation of Steel-making Mechanical Equipment
Appendix C Record of Quality Acceptance for Unit Works of Installation of Steel-making Mechanical Equipment
Appendix D Record of No-load Test Run of Steel-making Mechanical Equipment
Appendix E Criteria for Appearance Quality of Weld
Appendix F Postweld Heat Treatment of Welded Joint
Explanation of Wording in This Code
Explanation of Provisions
1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Foundation Bolt and Base Plate
3.1 General Requirements
3.2 Equipment Foundation
3.3 Foundation Bolt
4 Equipment and Material Mobilization
4.1 General Requirements
4.2 Equipment
4.3 Raw Materials
5 Installation of Converter
5.1 General Requirements
5.3 Backing Ring
5.4 Furnace Body
6 Installation of Oxygen Lance and Sublance
6.2 Oxygen Lance,Sublance and Lifting Device
8 Installation of Waste Heat Boiler(Vaporization Cooling Device)
8.1 General Requirements
8.2 Flue
8.3 Boiler Barrel
9 Installation of Electric Arc Furnace
9.2 Rail Chair
9.3 Cradle
9.5 Tilting Locking Device
9.6 Furnace Body
9.7 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
10 Installation of Ladle Refining Furnace(LF)
10.3 Buggy Ladle
11 Installation of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
11.1 General Requirements
11.2 Vacuum Tank
11.7 Vacuum Device
13 Installation of Argon Oxygen Decarburization Refining Furnace(AOD)
13.1 General Requirements
14 Installation of Casting equipment
14.2 Ladle Turret
14.3 Tundish Car and Track
15 Installation of Continuous Steel-casting Equipment
15.2 Mold and Vibrating Device
15.3 Secondary Cooling Device
15.4 Exchange Device for Segment
15.5 Withdrawal and Straightening Unit
15.6 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
15.7 Flame Cutting Machine
15.10 Burring Machine
16 Installation of Discharging and Finishing Equipment
16.2 Conveying Roller Table
16.7 Cross Travelling Trolley
16.8 Centering Device
17 Installation of Hot Metal Mixer
17.2 Base and Race
17.3 Furnace Shell and Tension Sleeve
18 Installation of Hot Metal Pretreatment Equipment
18.3 Stirring Desulfurization Equipment
18.7 Slag Remover
21 Test Run of Steel-making Mechanical Equipment
21.1 General Requirements
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜