万本电子书0元读

万本电子书0元读

顶部广告

GB50551-2010球团机械设备安装工程质量验收规范(英文版)电子书

售       价:¥

0人正在读 | 0人评论 9.8

作       者:住房和城乡建设部

出  版  社:中国计划出版社

出版时间:2015-12-01

字       数:8.6万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
本规范由我部标准定额研究所组织中国计划出版社出版发行。二○一○年五月三十一日本规范的技术内容包括:总则,术语,基本规定,设备基础、地脚螺栓和垫板,设备和材料进场,混合与造球设备安装工程,布料设备安装工程,竖炉设备安装工程,带式焙烧机设备安装工程,链箅机—回转窑设备安装工程,环式冷却机设备安装工程,球团机械设备试运转。本规范适用于新建和改、扩建球团机械设备安装工程的质量验收。
目录展开

书名页

版权页

Announcement of Ministry of Construction of the People's Republic of China

Foreword

1 General Provisions

2 Terms

3 Basic Requirement

4 Equipment Foundation,Anchor Bolt and Bearing Plate

4.1 General Requirement

4.2 Equipment Foundation

4.3 Anchor Bolt

4.4 Bearing Plate

5 Equipment and Materials in Site

5.1 General Requirement

5.2 Equipment

5.3 Materials

6 Mixing and Balling Equipment Installation Engineering

6.1 General Requirement

6.2 Intensive Mixer

6.3 Disc Pelletizer

7 Distribution Equipment Installation Engineering

7.1 General Requirement

7.2 Shuttle Conveyor Belt

7.3 Hearth and Side Layer Bin

7.4 Swing Distributor

7.5 Wide Transfer Belt

7.6 Roller Feeder

8 Shaft Furnace Equipment Installation Engineering

8.1 Pin Roll Discharger

8.2 Upper Steel Structure

8.3 Bottom Steel Structure

8.4 Hood

9 Traveling Grate Equipment Installation Engineering

9.1 Support

9.2 Head Pulley

9.3 Drive Unit

9.4 Head Curve and Middle Orbit

9.5 Tail Assembly

9.6 Sealing Chute

9.7 Pallet and Grate Cleaning Device and Sealing Plate

9.8 Pallet Replacing Device

9.9 Wind Boxes

9.10 Dust Bin and Bunker

9.11 Furnace Housing and Combustor

10 Grate-Kiln Equipment Installation Engineering

10.1 Support

10.2 Drive Unit

10.3 Conveyor Chain

10.4 Sealing Chute and Sealing Plate

10.5 Wind Boxes and Dust Bin

10.6 Spading Plate

10.7 Upper Housing and Auxiliary Stack

10.8 Kiln

11 Circular Cooler Equipment Installation Engineering

11.1 Support

11.2 Wind Boxes

11.3 Carrying and Thrust Rollers

11.4 Pallet Frame Assembly

11.5 Hopper

11.6 Pressing Rail

11.7 Drive Unit

11.8 Upper Stationary Housing

11.9 Pallet Tripper

12 Palletizing Mechanical Equipment Test Run

12.1 General Requirement

12.2 Intensive Mixer Test Run

12.3 Disc Pelletizer Test Run

12.4 Shuttle Conveyor Belt Test Run

12.5 Swing Distributor Test Run

12.6 Wide Transfer Belt Test Run

12.7 Roller Feeder Test Run

12.8 Spike Roll Discharger Test Run

12.9 Traveling Grate Machine Test Run

12.10 Chain Grate Test Run

12.11 Kiln Test Run

12.12 Circular Cooler Test Run

Appendix A Subdivision Works Quality Acceptance Record of Palletizing Mechanical Equipment Installation

Appendix B Division Works Quality Acceptance Record of Palletizing Mechanical Equipment Installation

Appendix C Unit Works Quality Acceptance Record of Palletizing Mechanical Equipment Installation

Appendix D No-load Commissioning Record of Palletizing Mechanical Equipment

Explanation of Wording in This Code

List of Quoted Standards

Explanation of provisions

Instructions for Explanation of Provisions

1 General Provisions

3 Basic Requirement

4 Equipment Foundation,Anchor Bolt and Bearing Plate

4.1 General Requirement

4.2 Equipment Foundation

4.3 Anchor Bolt

5 Equipment and Materials in Site

5.1 General Requirement

5.2 Equipment

5.3 Materials

6 Mixing and Balling Equipment Installation Engineering

6.2 Intensive Mixer

6.3 Disc Pelletizer

7 Distribution Equipment Installation Engineering

7.2 Shuttle Conveyor Belt

7.4 Swing Distributor

7.5 Wide Transfer Belt

8 Shaft Furnace Equipment Installation Engineering

8.1 Pin Roll Discharger

8.2 Upper Steel Structure

8.3 Bottom Steel Structure

9 Traveling Grate Equipment Installation Engineering

9.1 Support

9.2 Head Pulley

9.3 Drive Unit

9.4 Head Curve and Middle Orbit

9.5 Tail Assembly

9.6 Sealing Chute

9.7 Pallet and Grate Cleaning Device and Sealing Plate

9.11 Furnace Housing and Combustor

10 Grate-Kiln Equipment Installation Engineering

10.1 Support

10.2 Drive Unit

10.3 Conveyor Chain

10.4 Sealing Chute and Sealing Plate

10.5 Wind Boxes and Dust Bin

10.6 Spading Plate

10.7 Upper Housing and Auxiliary Stack

10.8 Kiln

11 Circular Cooler Equipment Installation Engineering

11.1 Support

11.3 Carrying and Thrust Rollers

11.4 Pallet Frame Assembly

11.6 Pressing Rail

12 Palletizing Mechanical Equipment Test Run

12.1 General Requirement

累计评论(0条) 0个书友正在讨论这本书 发表评论

发表评论

发表评论,分享你的想法吧!

买过这本书的人还买过

读了这本书的人还在读

回顶部