为你推荐
书名页
版权页
Announcement of the Ministry of Construction of the People's Republic of China
Foreword
1 General Provisions
2 Basic Requirement
3 Equipment Foundation,Anchor Bolt and Base Plate
3.1 General Requirement
3.2 Equipment Foundation
3.3 Anchor Bolts
3.4 Base Plate
4 Equipment and Material Approach
4.1 General Requirement
4.2 Equipment
4.3 Material
5 Feeding and Ore Drawing Equipment
5.1 General Requirement
5.2 Installation of Tramcar Dumper
5.3 Installation of Plate-Type Feeder
5.4 Installation of Electromagnetic Vibration Feeder
5.5 Installation of Disk Feeder
5.6 Installation of Chute Feeder
5.7 Installation of Chain And Pendulum Feeders
5.8 Installation of Ore Drawing Gate
5.9 Test Run of Feeding and Ore Drawing Equipment
6 Crushing,Grinding and Sieving Equipment
6.1 General Requirement
6.2 Installation of Jaw Crusher
6.3 Installation of Cycle Crusher
6.4 Installation of Taper Crusher
6.5 Installation of Ore Mill
6.6 Installation of Vibration Sieve
6.7 Test Run of Crushing,Grinding and Sieving Equipment
7 Classifying and Sorting Equipment
7.1 General Requirement
7.2 Installation of Spiral Classifier
7.3 Installation of Hydrocyclone
7.4 Installation of Fine Sieve
7.5 Installation of Barrel-Type Magnetic Separator
7.6 Installation of Turn Cage Magnetic Separator
7.7 Installation of Ring-Type Magnetic Separator
7.8 Installation of Magnetic Dewatering Tank
7.9 Installation of Flotator
7.10 Installation of Jigger
7.11 Installation of Swing Bed
7.12 Installation of Centrifugal Concentrator
7.13 Installation of Heavy-Medium Vibratory Chute
7.14 Installation of Spiral Concentrator
7.15 Test Run of Classifying and Sorting Equipment
8 Dewatering Equipment
8.1 General Requirement
8.2 Installation of Center Drive-Type Concentrator
8.3 Installation of Circum Drive-Type Concentrator
8.4 Installation of Feeding Chute Frame of Concentrator
8.5 Installation of Tube Internal Filtering Vacuum Filter
8.6 Installation of External Filtering Vacuum Filter
8.7 Test Run of Dewatering Equipment
Appendix A Quality Acceptance Record Table for Constituent Works of Mineral Processing Equipment Installation
Appendix B Quality Acceptance Record Table for Divisional Works of Mineral Processing Equipment Installation
Appendix C Quality Acceptance Record Table for Mineral Processing Equipment Installation Works
Appendix D Mineral Processing Equipment No-Load Test Run Record Table
Appendix E Appearance Quality Acceptance Record for Unit Works
Explanation of Wording in This Code
Explanations of Provisions
1 General Provisions
2 Basic Requirement
3 Equipment Foundation,Anchor Bolt and Base Plate
3.1 General Requirement
3.2 Equipment Foundation
3.3 Anchor Bolts
4 Equipment and Material Approach
4.1 General Requirement
4.2 Equipment
4.3 Materials
6 Crushing,Grinding and Sieving Equipment
6.2 Installation of Jaw Crusher
6.3 Installation of Taper Crusher
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜