为你推荐
书名页
版权页
Announcement of the Ministry of Construction of the People's Republic of China
Foreword
1 General Provisions
2 Basic Requirement
3 Equipment Foundation,Anchor Bolt and Shim Plate
3.1 General Requirement
3.2 Equipment Foundation
3.3 Anchor Bolt
3.4 Shim Plate
4 Equipment and Material Mobilization
4.1 General Requirement
4.2 Equipment
4.3 Raw Material
5 Installation for Material Feeder and Mixture Equipment
5.1 General Requirement
5.2 Constant Feeder
5.3 Mixture Equipment
6 Installation for Sintering Equipment
6.1 General Requirement
6.2 Framework
6.3 Shuttle Belt Conveyor
6.4 Bedding Trough,Mixed Trough
6.5 Cylinder Feeder
6.6 Deflector
6.7 Roller Distributor
6.8 Head Wheel
6.9 Gearing
6.10 Portfire Device
6.11 Head Bending Rail and Intermediate Rail
6.12 Tail Device
6.13 Sealing Slide and Sealing Plate
6.14 Trolley and Grate Cleaning Device
6.15 Heat Crusher
6.16 Bellows and Main Exhaust Tube
6.17 Ash Bucket and Chute
7 Installation for Circular Cooler
7.1 General Requirement
7.2 Framework
7.3 Grain Hopper
7.4 Bellows and Sealing Covering
7.5 Rail
7.6 Gearing Framework
7.7 Trolley and Gearing
7.8 Roller Block and Idler Roller
7.9 Ring-type Scraper Conveyor
7.10 Fan
8 Installation for Straight Cooler
8.1 General Requirement
8.2 Framework
8.3 Sealing Covering and Exhaust Tube
8.4 Gearing Device
8.5 Belt-type Scraper Conveyor
8.6 Fan
9 Installation for Main Exhausting Equipment
9.1 General Requirement
9.2 Bearing Base
9.3 Bearing
9.4 Housing Case and Rotor
9.5 Auxiliary Equipment
10 Installation for Electrical Dedusting Equipment
10.1 General Requirement
10.2 Body
10.3 Discharge Electrode and Dedusting Plate
10.4 Beating Device
10.5 Dust Conveying Device
11 Bag Filter
11.1 General Requirement
11.2 Body
11.3 Installation for Dust Conveying Device
12 Multiclone Dust Collector
12.1 General Requirement
12.2 Body Installation
12.3 Cyclone
13 Equipment Run Test
13.1 General Requirement
13.2 Run Test for Constant Feeder
13.3 Run Test for Mixer
13.4 Run Test for Sintering Equipment
13.5 Run Test for Circular Cooler
13.6 Run Test for Straight Cooler
13.7 Run Test for Main Exhausting Equipment
13.8 Run Test for Electrical Dedusting Equipment
13.9 Run Test for Bag Filter
13.10 Multi-tube Dedusting Equipment
Appendix A Quality Acceptance Record Sheet for Engineering Installation of Itemized Project of Sintering Mechanical Equipment
Appendix B Quality Acceptance Record Sheet for Engineering Installation of Partial Project of Sintering Mechanical Equipment
Appendix C Quality Acceptance Record Sheet for Engineering Installation of Unit Project of Sintering Mechanical Equipment
Appendix D Non-load Run Test Record Sheet for Sintering Mechanical Equipment
Explanation of Wording in This Code
Explanation for Previsions
1 General Provisions
2 Basic Requirement
3 Equipment Foundation,Anchor Bolt and Shim Plate
3.1 General Requirement
3.2 Equipment Foundation
3.3 Anchor Bolt
4 Equipment and Material Mobilization
4.1 General Requirement
4.2 Equipment
4.3 Raw Material
5 Installation for Material Feeder and Mixture Equipment
5.3 Mixture Equipment
6 Installation for Sintering Equipment
6.1 General Requirement
6.2 Framework
6.3 Shuttle Belt Conveyor
6.4 Bedding Trough,Mixed Trough
6.6 Deflector
6.8 Head Wheel
6.9 Gearing
6.10 Portfire Device
6.11 Head Bending Rail and Intermediate Rail
6.12 Tail Device
6.13 Sealing Slide and Sealing Plate
6.14 Trolley and Grate Cleaning Device
6.15 Heat Crusher
6.16 Bellows and Main Exhaust Tube
7 Installation for Circular Cooler
7.2 Framework
7.5 Rail
7.6 Gearing Framework
7.7 Trolley and Gearing
7.10 Fan
9 Installation for Main Exhausting Equipment
9.4 Housing Case and Rotor
10 Installation for Electrical Dedusting Equipment
10.2 Body
10.3 Discharge Electrode and Dedusting Plate
10.4 Beating Device
11 Bag Filter
11.2 Body
13 Equipment Run Test
13.1 General Requirement
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜