为你推荐
书名页
版权页
Announcement of the Ministry of Construction of the People's Republic of China
Foreword
1 General Provisions
2 Basic Requirements
2.1 General Requirements
2.2 Inspection of Main Equipment and Materials
2.3 Division of Construction Quality Acceptance for Electrical Equipment Installation Engineering in Metallurgy
2.4 Quality Acceptance of Electrical Equipment Installation Engineering in Metallurgy
2.5 Procedure and Organization for Construction Quality Acceptance of Electrical Equipment Installation Engineering in Metallurgy
2.6 Documents for Completion Acceptance of Works
3 Installation of High-Voltage Electrical Equipment
3.1 Dominant Items
3.2 General Items
4 Installation of Power Transformer
4.1 Dominant Items
4.2 General Items
5 Installation of Instrument Transformer,Reactor,Lightning Arrester and Capacitor
5.1 Dominant Items
5.2 General Items
6 Installation of Electrical Rotating Motor
6.1 Dominant Items
6.2 General Items
7 Installation of Distribution Panel and Switch Cabinet
7.1 Dominant Items
7.2 General Items
8 Installation of Storage Battery
8.1 Dominant Items
8.2 General Items
9 Installation of Low-Voltage Apparatus
9.1 Dominant Items
9.2 General Items
10 Installation of Electrical Equipment for Crane
10.1 Dominant Items
10.2 General Items
11 Installation of Trolley Line and Traveling Flexible Cable
11.1 Dominant Items
11.2 General Items
12 Installation of Busbar Device
12.1 Dominant Items
12.2 General Items
13 Cable Line
13.1 Dominant Items
13.2 General Items
14 Laying of Lines in Open Pit Mine
14.1 Dominant Items
14.2 General Items
15 Laying of Cables in Underground Mine
15.1 Dominant Items
15.2 General Items
16 Installation of Cable Bearer and Tray
16.1 Dominant Items
16.2 General Items
17 Preparation of Cable Terminal and Joint
17.1 Dominant Items
17.2 General Items
18 Installation of Overhead Line and Pole-Mounted Electrical Equipment
18.1 Dominant Items
18.2 General Items
19 Installation of Traction Network
19.1 Dominant Items
19.2 General Items
20 Piping and Wiring
20.1 Dominant Items
20.2 General Items
21 Installation of Electrical Lighting Equipment
21.1 Dominant Items
21.2 General Items
22 Installation of Lighting Fixture and Distribution Box in Mine
22.1 Dominant Items
22.2 General Items
23 Installation of Lightning Rod(Conduction)and Grounding Device
23.1 Dominant Items
23.2 General Items
24 Laying of Electrical Lines in Explosive Gas Atmospheres
24.1 Dominant Items
24.2 General Items
25 Installation of Electrical Equipment in Explosive Gas Atmospheres
25.1 Dominant Items
25.2 General Items
26 Installation of Electrical Equipment in Fire Hazardous Area
26.1 Dominant Items
26.2 General Items
Appendix A Construction Site Quality Inspection and Acceptance Record
Appendix B Standard for Material and Electrolyte of Storage Battery
Appendix C Rectangular Busbar Lapping Requirements
Appendix D Safe Net Distance for Power Distribution Unit
Appendix E Minimum Clearance Between Buried Cables Where Cables Are Parallel With and Cross Pipes,Roads and Buildings
Appendix F Zoning of Explosion and Fire Hazardous Areas
Explanation of Wording in This Code
Explanation of Provisions
1 General Provisions
2 Basic Requirements
2.1 General Requirements
2.2 Inspection of Main Equipment and Materials
2.3 Division of Construction Quality Acceptance for Electrical Equipment Installation Engineering in Metallurgy
2.4 Quality Acceptance of Electrical Equipment Installation Engineering in Metallurgy
2.5 Procedure and Organization for Construction Quality Acceptance of Electrical Equipment Installation Engineering in Metallurgy
2.6 Documents for Completion Acceptance of Works
3 Installation of High-Voltage Electrical Equipment
3.1 Dominant Items
3.2 General Items
4 Installation of Power Transformer
4.1 Dominant Items
4.2 General Items
5 Installations of Instrument Transformer,Reactor,Lightning Arrester and Capacitor
5.1 Dominant Items
5.2 General Items
6 Installation of Electrical Rotating Motor
6.1 Dominant Items
6.2 General Items
7 Installation of Distribution Panel and Switch Cabinet
7.1 Dominant Items
7.2 General Items
8 Installation of Storage Battery
9 Installation of Low-Voltage Apparatus
9.1 Dominant Items
9.2 General Items
10 Installation of Electrical Equipment for Crane
10.1 Dominant Items
10.2 General Items
11 Installation of Trolley Line and Traveling Flexible Cable
11.1 Dominant Items
11.2 General Items
12 Installation of Busbar Device
12.1 Dominant Items
12.2 General Items
13 Cable Line
13.1 Dominant Items
13.2 General Items
14 Laying of Lines in Open Pit Mine
14.1 Dominant Items
14.2 General Items
15 Laying of Cables in Underground Mine
15.1 Dominant Items
15.2 General Items
16 Installation of Cable Bearer and Tray
16.1 Dominant Items
16.2 General Items
17 Preparation of Cable Terminal and Joint
17.1 Dominant Items
17.2 General Items
18 Installation of Overhead Line and Pole-Mounted Electrical Equipment
18.1 Dominant Items
18.2 General Items
19 Installation of Traction Network
19.1 Dominant Items
19.2 General Items
20 Piping and wiring
20.1 Dominant Items
20.2 General Items
21 Installation of Electrical Lighting Equipment
21.1 Dominant Items
21.2 General Items
22 Installation of Lighting Fixture and Distribution Box in Mine
22.1 Dominant Items
22.2 General Items
23 Installation of Lightning Rod(Conduction)and Grounding Device
23.1 Dominant Items
23.2 General Items
24 Laying of Electrical Lines in Explosive Gas Atmospheres
24.1 Dominant Items
24.2 General Items
25 Installation of Electrical Equipment in Explosive Gas Atmospheres
25.1 Dominant Items
25.2 General Items
26 Installation of Electrical Equipment in Fire Hazardous Area
26.1 Dominant Items
26.2 General Items
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜