为你推荐
书名页
版权页
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Foundation Bolt and Base Plate
3.1 Hand-over and Acceptance of Equipment Foundation
3.2 Base Line and Base Mark for Equipment Installation
3.3 Foundation Bolt
3.4 Base Plate
4 Equipment and Material Mobilization
4.1 Equipment Mobilization
4.2 Material Mobilization
5 Converter Installation
5.1 Trunnion Bearing Pedestal and Trunnion Bearing
5.2 Backing Ring
5.3 Furnace Body
5.4 Tilting Device
5.5 Removable Guard Board and Fixed Guard Board
6 Installation of Oxygen Lance and Sublance
6.1 Oxygen Lance
6.2 Sublance
6.3 Nitrogen Sealing Device
6.4 Probe Mounting Machine and Pulling Machine for Sublance
7 Installation of Hood
7.1 Skirt of Hood
7.2 Removable Hood
8 Installation of Waste Heat Boiler
8.1 General Requirements
8.2 Flue
8.3 Boiler Barrel
8.4 Piping for Steam and Water Systems
8.5 Heat Accumulator
8.6 Deoxidization Water Tank
9 Installation of Electric Arc Furnace
9.1 Rail Chair
9.2 Tilting Device
9.3 Tilting Locking Device
9.4 Cradle
9.5 Furnace Body
9.6 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
9.7 Electrode Lifting Mechanism and Electrode Clamping Mechanism
9.8 Oxygen Lance
10 Installation of Ladle Refining Furnace
10.1 Track for Buggy Ladle
10.2 Buggy Ladle
10.3 Furnace Cover Cradle,Furnace Cover and Furnace Cover Lifting Mechanism
10.4 Electrode Lifting Mechanism and Electrode Clamping Mechanism
11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter
11.1 General Requirements
11.2 Vacuum Tank
11.3 Vacuum Tank Cap and Tank Cap Lifting Mechanism
11.4 Vacuum Device
11.5 Oxygen Lance
12 Installation of Recirculation Vacuum Degassing Refining Furnace
12.1 General Requirements
12.2 Vacuum Degassing Chamber Car and Degassing Chamber
12.3 Ladle Lifting Device
12.4 Preheating Device for Vacuum Degassing Chamber
12.5 Oxygen Lance
13 Installation of Casting Equipment
13.1 Ladle Turret
13.2 Tundish Car and Track
13.3 Roaster
14 Installation of Continuous Steel-casting Equipment
14.1 Mold and Vibrating Device
14.2 Secondary Cooling Device
14.3 Exchange Device for Segment
14.4 Withdrawal and Straightening Unit
14.5 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
14.6 Flame Cutting Machine
14.7 Rocking Shear
14.8 Crop Collecting Device
14.9 Burring Machine
15 Installation of Discharging and Finishing Equipment
15.1 Run-out Roller Table
15.2 Turntable
15.3 Pusher,Puller and Tilter
15.4 Scarfer
15.5 Lifting Guard Board and Marking Punch
15.6 Cross Travelling Trolley
15.7 Centering Device
16 Installation of Hot Metal Mixer
16.1 Base and Roller
16.2 Furnace Shell
16.3 Tilting Device
16.4 Cover Manipulator
17 Installation of Hot Metal Pretreatment Equipment
17.1 Desulfurizer(Dephosphorizer)Conveying Device
17.2 Stirring Desulfurization Equipment
17.3 Injection Dephosphorization Equipment
17.4 Molten Iron Tank Car and Track
17.5 Slag Remover
18 Test Run of Steel-making Mechanical Equipment
18.1 General Requirements
18.2 Test Run of Converter
18.3 Test Run of Oxygen Lance and Sublance
18.4 Test Run of Hood
18.5 Test Run of Waste Heat Boiler System
18.6 Test Run of Electric Arc Furnace
18.7 Test Run of Ladle Refining Furnace
18.8 Test Run of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter
18.9 Test Run of Recirculation Vacuum Degassing Refining Furnace
18.10 Test Run of Casting Equipment
18.11 Test Run of Continuous Steel-casting Equipment
18.12 Test Run of Discharging and Finishing Equipment
18.13 Test Run of Hot Metal Mixer
18.14 Test Run of Hot Metal Pretreatment Equipment
19 Safety and Environmental Protection
Explanation of Wording in This Code
Normative Standard
Explanation of Provisions
Statement on Preparation
1 General Provisions
2 Basic Requirements
3 Equipment Foundation,Foundation Bolt and Base Plate
3.1 Hand-over and Acceptance of Equipment Foundation
3.2 Base Line and Base Mark for Equipment Installation
3.3 Foundation Bolt
3.4 Base Plate
4 Equipment and Material Mobilization
4.1 Equipment Mobilization
4.2 Material Mobilization
5 Converter Installation
5.1 Trunnion Bearing Pedestal and Trunnion Bearing
5.2 Backing Ring
5.3 Furnace Body
5.4 Tilting Device
6 Installation of Oxygen Lance and Sublance
6.1 Oxygen Lance
6.2 Sublance
7 Installation of Hood
7.2 Removable Hood
8 Installation of Waste Heat Boiler
8.1 General Requirements
8.2 Flue
9 Installation of Electric Arc Furnace
9.1 Rail Chair
9.3 Tilting Locking Device
9.4 Cradle
9.5 Furnace Body
9.6 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
9.7 Electrode Lifting Mechanism and Electrode Clamping Mechanism
10 Installation of Ladle Refining Furnace
10.3 Furnace Cover Cradle,Furnace Cover and Furnace Cover Lifting Mechanism
10.4 Electrode Lifting Mechanism and Electrode Clamping Mechanism
11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter
11.2 Vacuum Tank
11.3 Vacuum Tank Cap and Tank Cap Lifting Mechanism
11.5 Oxygen Lance
12 Installation of Recirculation Vacuum Degassing Refining Furnace
12.2 Vacuum Degassing Chamber Car and Degassing Chamber
12.4 Preheating Device for Vacuum Degassing Chamber
13 Installation of Casting Equipment
13.1 Ladle Turret
14 Installation of Continuous Steel-casting Equipment
14.1 Mold and Vibrating Device
14.2 Secondary Cooling Device
14.4 Withdrawal and Straightening Unit
14.5 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
14.9 Burring Machine
15 Installation of Discharging and Finishing Equipment
15.6 Cross Travelling Trolley
15.7 Centering Device
16 Installation of Hot Metal Mixer
16.1 Base and Roller
16.2 Furnace Shell
17 Installation of Hot Metal Pretreatment Equipment
17.5 Slag Remover
18 Test Run of Steel-making Mechanical Equipment
18.1 General Requirements
18.3 Test Run of Oxygen Lance and Sublance
19 Safety and Environmental Protection
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜