万本电子书0元读

万本电子书0元读

顶部广告

GB50742-2012炼钢机械设备安装规范(英文版)电子书

售       价:¥

8人正在读 | 0人评论 9.8

作       者:中国冶金建设协会

出  版  社:中国计划出版社

出版时间:2016-01-01

字       数:22.4万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
本规范共19章,主要内容包括:总则,基本规定,设备基础、地脚螺栓及垫板,设备和材料进场,转炉设备安装,氧枪和副枪设备安装,烟罩设备安装,余热锅炉设备安装,电弧炉设备安装,钢包精炼炉设备安装,钢包真空精炼炉及真空吹氧脱碳炉设备安装,循环真空脱气精炼炉设备安装,浇注设备安装,连续铸钢设备安装,出坯和精整设备安装,混铁炉安装,铁水预处理设备安装,炼钢机械设备试运转,安全和环保等。
目录展开

书名页

版权页

Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China

Foreword

1 General Provisions

2 Basic Requirements

3 Equipment Foundation,Foundation Bolt and Base Plate

3.1 Hand-over and Acceptance of Equipment Foundation

3.2 Base Line and Base Mark for Equipment Installation

3.3 Foundation Bolt

3.4 Base Plate

4 Equipment and Material Mobilization

4.1 Equipment Mobilization

4.2 Material Mobilization

5 Converter Installation

5.1 Trunnion Bearing Pedestal and Trunnion Bearing

5.2 Backing Ring

5.3 Furnace Body

5.4 Tilting Device

5.5 Removable Guard Board and Fixed Guard Board

6 Installation of Oxygen Lance and Sublance

6.1 Oxygen Lance

6.2 Sublance

6.3 Nitrogen Sealing Device

6.4 Probe Mounting Machine and Pulling Machine for Sublance

7 Installation of Hood

7.1 Skirt of Hood

7.2 Removable Hood

8 Installation of Waste Heat Boiler

8.1 General Requirements

8.2 Flue

8.3 Boiler Barrel

8.4 Piping for Steam and Water Systems

8.5 Heat Accumulator

8.6 Deoxidization Water Tank

9 Installation of Electric Arc Furnace

9.1 Rail Chair

9.2 Tilting Device

9.3 Tilting Locking Device

9.4 Cradle

9.5 Furnace Body

9.6 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism

9.7 Electrode Lifting Mechanism and Electrode Clamping Mechanism

9.8 Oxygen Lance

10 Installation of Ladle Refining Furnace

10.1 Track for Buggy Ladle

10.2 Buggy Ladle

10.3 Furnace Cover Cradle,Furnace Cover and Furnace Cover Lifting Mechanism

10.4 Electrode Lifting Mechanism and Electrode Clamping Mechanism

11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter

11.1 General Requirements

11.2 Vacuum Tank

11.3 Vacuum Tank Cap and Tank Cap Lifting Mechanism

11.4 Vacuum Device

11.5 Oxygen Lance

12 Installation of Recirculation Vacuum Degassing Refining Furnace

12.1 General Requirements

12.2 Vacuum Degassing Chamber Car and Degassing Chamber

12.3 Ladle Lifting Device

12.4 Preheating Device for Vacuum Degassing Chamber

12.5 Oxygen Lance

13 Installation of Casting Equipment

13.1 Ladle Turret

13.2 Tundish Car and Track

13.3 Roaster

14 Installation of Continuous Steel-casting Equipment

14.1 Mold and Vibrating Device

14.2 Secondary Cooling Device

14.3 Exchange Device for Segment

14.4 Withdrawal and Straightening Unit

14.5 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device

14.6 Flame Cutting Machine

14.7 Rocking Shear

14.8 Crop Collecting Device

14.9 Burring Machine

15 Installation of Discharging and Finishing Equipment

15.1 Run-out Roller Table

15.2 Turntable

15.3 Pusher,Puller and Tilter

15.4 Scarfer

15.5 Lifting Guard Board and Marking Punch

15.6 Cross Travelling Trolley

15.7 Centering Device

16 Installation of Hot Metal Mixer

16.1 Base and Roller

16.2 Furnace Shell

16.3 Tilting Device

16.4 Cover Manipulator

17 Installation of Hot Metal Pretreatment Equipment

17.1 Desulfurizer(Dephosphorizer)Conveying Device

17.2 Stirring Desulfurization Equipment

17.3 Injection Dephosphorization Equipment

17.4 Molten Iron Tank Car and Track

17.5 Slag Remover

18 Test Run of Steel-making Mechanical Equipment

18.1 General Requirements

18.2 Test Run of Converter

18.3 Test Run of Oxygen Lance and Sublance

18.4 Test Run of Hood

18.5 Test Run of Waste Heat Boiler System

18.6 Test Run of Electric Arc Furnace

18.7 Test Run of Ladle Refining Furnace

18.8 Test Run of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter

18.9 Test Run of Recirculation Vacuum Degassing Refining Furnace

18.10 Test Run of Casting Equipment

18.11 Test Run of Continuous Steel-casting Equipment

18.12 Test Run of Discharging and Finishing Equipment

18.13 Test Run of Hot Metal Mixer

18.14 Test Run of Hot Metal Pretreatment Equipment

19 Safety and Environmental Protection

Explanation of Wording in This Code

Normative Standard

Explanation of Provisions

Statement on Preparation

1 General Provisions

2 Basic Requirements

3 Equipment Foundation,Foundation Bolt and Base Plate

3.1 Hand-over and Acceptance of Equipment Foundation

3.2 Base Line and Base Mark for Equipment Installation

3.3 Foundation Bolt

3.4 Base Plate

4 Equipment and Material Mobilization

4.1 Equipment Mobilization

4.2 Material Mobilization

5 Converter Installation

5.1 Trunnion Bearing Pedestal and Trunnion Bearing

5.2 Backing Ring

5.3 Furnace Body

5.4 Tilting Device

6 Installation of Oxygen Lance and Sublance

6.1 Oxygen Lance

6.2 Sublance

7 Installation of Hood

7.2 Removable Hood

8 Installation of Waste Heat Boiler

8.1 General Requirements

8.2 Flue

9 Installation of Electric Arc Furnace

9.1 Rail Chair

9.3 Tilting Locking Device

9.4 Cradle

9.5 Furnace Body

9.6 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism

9.7 Electrode Lifting Mechanism and Electrode Clamping Mechanism

10 Installation of Ladle Refining Furnace

10.3 Furnace Cover Cradle,Furnace Cover and Furnace Cover Lifting Mechanism

10.4 Electrode Lifting Mechanism and Electrode Clamping Mechanism

11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter

11.2 Vacuum Tank

11.3 Vacuum Tank Cap and Tank Cap Lifting Mechanism

11.5 Oxygen Lance

12 Installation of Recirculation Vacuum Degassing Refining Furnace

12.2 Vacuum Degassing Chamber Car and Degassing Chamber

12.4 Preheating Device for Vacuum Degassing Chamber

13 Installation of Casting Equipment

13.1 Ladle Turret

14 Installation of Continuous Steel-casting Equipment

14.1 Mold and Vibrating Device

14.2 Secondary Cooling Device

14.4 Withdrawal and Straightening Unit

14.5 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device

14.9 Burring Machine

15 Installation of Discharging and Finishing Equipment

15.6 Cross Travelling Trolley

15.7 Centering Device

16 Installation of Hot Metal Mixer

16.1 Base and Roller

16.2 Furnace Shell

17 Installation of Hot Metal Pretreatment Equipment

17.5 Slag Remover

18 Test Run of Steel-making Mechanical Equipment

18.1 General Requirements

18.3 Test Run of Oxygen Lance and Sublance

19 Safety and Environmental Protection

累计评论(0条) 0个书友正在讨论这本书 发表评论

发表评论

发表评论,分享你的想法吧!

买过这本书的人还买过

读了这本书的人还在读

回顶部