万本电子书0元读

万本电子书0元读

顶部广告

GB51171-2016通信线路工程验收规范(英文版)电子书

售       价:¥

4人正在读 | 0人评论 9.8

作       者:中华人民共和国住房和城乡建设部

出  版  社:中国计划出版社

出版时间:2019-05-01

字       数:14.0万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
本规范共分14章,主要技术内容包括:总则、术语与符号、器材检验、线路路由、土(石)方、架空杆路、光(电)缆敷设、线路保护与防护、光(电)缆交接箱与分线设备、光(电)缆接续、光(电)缆进局及成端、光(电)缆测试、竣工文件编制、工程验收。本规范适用于陆地新建通信线路工程及改建、扩建通信线路工程的验收。
目录展开

书名页

版权页

Foreward

1 General Provisions

2 Terms

3 Material Test

3.1 General Requirements

3.2 Single-drum Optical Fiber Cable Examination

3.3 Single-drum Cable Examination

3.4 Wire Pole Examination

3.5 Examination of Silicon-core Pipe and Accessories

3.6 Examination of Stranded Galvanized Steel Wire and Ironware

3.7 Joint Box and Splice Jacket Examination

3.8 Connector Examination

3.9 Distribution Frame Examination

3.10 Distribution Cabinet Examination

3.11 Examination on Microduct,Microduct Bundle,Microduct Cable and Microduct Accessories

3.12 Other Cable Line Material Examination

4 Cable Route

5 Earth Works

5.1 Excavation

5.2 Backfilling

6 Overhead Pole Line for Overhead Cable

6.1 Pole Erecting

6.2 Pole Extension

6.3 Pole Footing

6.4 Stay Wire

6.5 Bracing Pole

6.6 Pole Numbering

6.7 Overhead Suspension Wire

7 Laying of Optical(Electrical)Cables

7.1 General Requirements

7.2 Laying of Directly-buried Optical(Electrical)Cables

7.3 Installation of Overhead Optical(Electrical)Cables

7.4 Installation of Wall-mounted Optical(Electrical)Cables

7.5 Laying of Duct Optical(Electrical)Cables

7.6 Laying of Underwater Optical(Electrical)Cables

7.7 Leading-up of Optical(Electrical)Cables

7.8 Laying of Micro Duct and Micro Cable

7.9 Laying and Installation of Silicon-cored Plastic Duct

7.10 Manhole(Handhole)Construction of Silicon-cored Plastic Pipe

8 Cable Line Protection and Preservation

8.1 Built-in Pipe,Brick-Paving,Cover-board,and Cement Mortar Bag

8.2 Terrace Slope Reinforcement and Protection

8.3 Protection of Underwater Optical(Electrical)Cable

8.4 Protection of Pole Line,Stay Wire,Suspension Wire and Overhead Line

8.5 Protection of Silicon-cored Pipe

8.6 Stone Marker and Sign Board

8.7 Protection against High Power

8.8 Lightning Protection

8.9 Other Protection Requirements

9 Optical(Electrical)Cable Cross Connection Box and Distribution Device

9.1 Installationof Optical(Electrical)Cable Cross Connection Box

9.2 Installation of Distribution Device

10 Optical(Electrical)Cable Splicing

10.1 General Requirement

10.2 Optical Cable Splicing and Encapsulation

10.3 Splicing and Encapsulation of Electrical Cable

11 Optical(Electrical)Cable Lead-in and Termination

11.1 Installation of Optical(Electrical)Cable in the Equipment Room

11.2 Installation of Optical Cable Termination

11.3 Installation of Electrical Cable Termination

12 Optical(Electrical)Cable Test

12.1 Optical Cable Test

12.2 Electrical Cable Test

13 Preparation of As-built Documentation

14 Final Acceptance of Work

14.1 Follow-up Test

14.2 Preliminary Acceptance

14.3 Trial-run

14.4 Final Acceptance

Appendix A Single-drum and Whole-process Test Parameters for Copper-cored Plastic Cables

Appendix B Requirements for Earthing Resistance of Lightning Wire and Length of Extension Line(Underground Part)

Appendix C Requirements for Earthing Resistance of Optical(Electrical)Cable Suspension Wires and Other Facilities

Appendix D Original Erection Sag for Suspension Wire of Overhead Optical(Electrical)Cable

Appendix E Test Record for Repeater Section of Optical Cable Line

Appendix F Permissible Reduction Value of Air Plug Pressure

Appendix G Permissible Air Pressure Reduction of Plastic Cable in 24h

Explanation of Wording in This Code

List of Quoted Standards

累计评论(0条) 0个书友正在讨论这本书 发表评论

发表评论

发表评论,分享你的想法吧!

买过这本书的人还买过

读了这本书的人还在读

回顶部