本规范适用于蒸汽初参数为超高压及以上、单台机组容量在125MW及以上,采用直接燃烧方式、主要燃用固体化石燃料的火力发电厂工程的设计。
目录展开

书名页

版权页

Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

Foreword

1 General

2 Terms

3 Requirements of Electric Power System on Fossil Fired Power Plants

3.1 Basic Requirement

3.2 Technical Requirements on the Connection of Power Plant to the Power System

3.3 Requirements on Operating and Regulating Performance of Generating Units

3.4 Requirements on the Operation Capability of the Units under Abnormal Conditions

4 Overall Planning

4.1 Basic Requirement

4.2 Off-site Planning

4.3 Plant Area Planning and General Layout

5 Unit Type Selection

5.1 Unit Parameters

5.2 Type Selection of Main Equipment

5.3 Capacity Matching between Main Equipment

5.4 Design Performance Indicators of Units

6 General Arrangement of Main Power House

6.1 Basic Requirement

6.2 Arrangement of Turbine House and Deaerator Bay

6.3 Arrangement of Coal Bunker Bay

6.4 Arrangement of Boiler

6.5 Main Control Room and Electronic Equipment Room

6.6 Arrangement of Flue Gas Desulphurization Facilities

6.7 Arrangement of Flue Gas Denitration Facilities

6.8 Maintenance

6.9 Requirements on Comprehensive Facilities

7 Coal Handling System

7.1 Basic Requirement

7.2 Coal Unloading Facilities

7.3 Coal Storage Facilities

7.4 Belt Conveyor

7.5 Screening and Crushing Devices

7.6 Coal Mixing Facilities

7.7 Coal Handling System for Circulating Fluidized Bed(CFB)Boiler

7.8 Limestone Milling System for CFB Boilers

7.9 Auxiliary Coal Handling Facilities

8 Boiler Equipment and System

8.1 Boiler Equipment

8.2 Pulverized Coal Preparation

8.3 Air and Flue Gas System

8.4 Flue Gas Precipitator and Emission System

8.5 Start-up System of Once-Through Boilers

8.6 Ignition and Combustion Supporting Fuel System

8.7 Auxiliary Systems of Boilers

8.8 Startup Boiler

8.9 Circulating Fluidized Bed(CFB)Boilers

9 Ash Handling System

9.1 Basic Requirement

9.2 Bottom Ash Handling System

9.3 Fly Ash Handling System

9.4 Ash Handling System Outside the Power Plant

9.5 Auxiliary Facilities

9.6 Ash Disposal Area

10 Flue Gas Desulphurization System

10.1 Basic Requirement

10.2 Absorbent Preparation System

10.3 Sulfur Dioxide Absorbing System

10.4 Flue Gas System

10.5 Desulphurization by-Product Treatment System

11 Flue Gas Denitration Reaction System

11.1 Basic Requirement

11.2 Reducing Agent Storage and Supply System

11.3 Flue Gas Denitration Reaction System

11.4 Ammonia/Air Mixing and Injecting System

12 Steam Turbine Equipment and Systems

12.1 Steam Turbine Equipment

12.2 Main Steam,Reheat Steam and Bypass System

12.3 Feedwater System

12.4 Deaerator and Feedwater Storage Tank

12.5 Condensate System

12.6 Drainage System

12.7 Cooling Water System of Auxiliary Equipment

12.8 Auxiliary System and Equipment of Cogeneration Units

12.9 Condenser and Its Auxiliary Facilities

13 Water Treatment System

13.1 Water Quality and Water Pretreatment

13.2 Water Pre-desalination

13.3 Boiler Makeup Water Treatment

13.4 Steam Turbine Condensate Polishing

13.5 Cooling Water Treatment

13.6 Chemical Dosing and Water-Steam Sampling for Thermal Process System

13.7 Treatment for Makeup Water of District Heating System and Industrial Return Water

13.8 Wastewater Treatment

13.9 Chemical Storage

14 Information System

14.1 Basic Requirement

14.2 Overall Plan of Plant Information System

14.3 Supervisory Information System for Plant Level

14.4 Management Information Systems

14.5 Price Bidding System

14.6 Video Monitoring System

14.7 Video Meeting System

14.8 Access Guard Management System

14.9 Training Simulator

14.10 Cabling

14.11 Information Security

15 Instrumentation and Control

15.1 Basic Requirement

15.2 Level of Automation

15.3 Control Mode and Control Room

15.4 Measurement and Instruments

15.5 Alarming System

15.6 Protection System

15.7 On-off Control

15.8 Modulating Control

15.9 Unit Control System

15.10 Auxiliary Workshop Control System

15.11 Control Power Supply

15.12 Instrument Tube,Cable,and Arrangement of Local Equipment

16 Electrical Equipment and System

16.1 Generator and Generator Transformer

16.2 Main Electrical Connection

16.3 AC Auxiliary Power System

16.4 DC System and AC Uninterruptible Power Supplies(UPS)

16.5 High Voltage Switchyards

16.6 Electrical Monitoring and Control

16.7 Relay Protection for Components

16.8 Lighting System

16.9 Sizing and Cabling of Cables

16.10 Grounding System

16.11 System Relaying Protection and Security Automatic Equipment

16.12 Dispatching Automation Subsystem

16.13 System Communication

16.14 Inner Communication

16.15 Other Electrical Facilities

17 Hydraulic Facilities and Systems

17.1 Basic Requirement

17.2 Water Source and Water Management

17.3 Cooling Water System

17.4 Water Intake Buildings(Structures)

17.5 Pipeline and Channel

17.6 Wet Cooling Tower

17.7 Water Surface Cooling

17.8 Air Cooling System

17.9 Water Supply and Drainage

18 Auxiliary and Ancillary Facilities

19 Buildings and Structures

19.1 Basic Requirement

19.2 Seismic Resistant Design

19.3 Architectural Design

19.4 Subgrade and Foundation

19.5 Main Power House Structure

19.6 Chimney

19.7 Coal Handling Buildings and Structures

19.8 Hydraulic Buildings and Structures

19.9 Supporting Structure of Air-cooled Condenser

20 Heating,Ventilation and Air Conditioning

20.1 Basic Requirement

20.2 Main Power House

20.3 Electrical Buildings and Electrical Equipment

20.4 Coal Handling Building

20.5 Chemical Building

20.6 Other Auxiliary and Ancillary Buildings

20.7 Refrigerating Station,Heating Station,and Piping Network in the Plant Area

21 Environmental Protection and Soil and Water Conservation

21.1 Basic Requirement

21.2 Prevention and Control of Atmospheric Pollution

21.3 Waste Water and Warm Water Discharge Treatment

21.4 Treatment and Comprehensive Utilization of Ash and Gypsum

21.5 Noise Prevention and Control

21.6 Environmental Protection Monitoring

21.7 Soil and Water Conservation

22 Firefighting and Occupational Safety and Health

22.1 Basic Requirement

22.2 Occupational Safety

22.3 Occupational Health