万本电子书0元读

万本电子书0元读

顶部广告

GB51005-2014水泥工厂余热发电工程施工与质量验收规范(英文版)电子书

售       价:¥

7人正在读 | 0人评论 9.8

作       者:中华人民共和国住房和城乡建设部

出  版  社:中国计划出版社

出版时间:2019-03-01

字       数:26.2万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
本规范适用于新建、改建和扩建水泥工厂余热发电工程的施工和质量验收。   本规范主要内容包括:总则、术语、基本规定、余热锅炉、烟风管道及相关设备、汽轮机组、管道、焊接、热工仪表及自动化控制装置、电气设备及系统、 水处理、建筑工程、 油漆保温、整套启动调试和验收等。
目录展开

书名页

版权页

Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

Foreword

1 General Provisions

2 Terms

3 Basic Requirements

3.1 Construction Basis

3.2 Construction Preparation

3.3 Construction Procedure

3.4 Construction Safety

3.5 Environmental Protection

3.6 Project Acceptance

4 Waste Heat Boiler

4.1 General Requirements

4.2 Boiler Steel Frame and Related Accessories

4.3 Pressure Parts

4.4 Auxiliary Pipeline and Equipment

4.5 Boiler Drying,Boiling Out,Purging and Tightness Test

4.6 Project Acceptance

5 Gas Duct and Related Equipment

5.1 General Requirements

5.2 Assembly and Installation of Gas Duct

5.3 Installation of Dust Separator

5.4 Installation of Gas Damper

5.5 Installation of Dust Collection System

5.6 Installation of Expansion Joint of Gas Duct

5.7 Project Acceptance

6 Steam Turbine and Generator Set

6.1 General Requirements

6.2 Steam Turbine and Generator Set

6.3 Generator and Exciter

6.4 Governing Protection System and Oil System

6.5 Pipeline of steam turbine proper

6.6 Auxiliary equipment

6.7 Individual Test of the Accessories and Auxiliary of Steam Turbine Generator Set

6.8 Project acceptance

7 Pipeline

7.1 General Requirements

7.2 On-site Quality Inspection and Acceptance of Pipeline Components

7.3 Preparation of Pipeline and Components

7.4 Pipeline Installation

7.5 Test and Flushing for the Pipeline System

7.6 Project Acceptance

8 Welding

8.1 General Requirements

8.2 Steel,Welding Materials and Equipment

8.3 Preparation before Welding

8.4 Welding Procedure

8.5 Heat Treatment After Welding

8.6 Project Acceptance

9 Thermodynamic Instruments and Automation Control Devices

9.1 General Requirements

9.2 Installation of Source Component and Sensitive Elements

9.3 Installation of Local Instrument

9.4 Control Panel(Console,Box,Cabinet)Installation

9.5 Pipeline Laying and Connection

9.6 Protection and Grounding

9.7 Debugging of Thermodynamic and Automatic Instruments and Control Devices

9.8 Project Acceptance

10 Electrical Equipment and System

10.1 General Requirements

10.2 Installation of Cable Tray

10.3 Cable Laying

10.4 Complete Set of HV Switch Cabinet

10.5 Complete Set of LV Switch Cabinet

10.6 Generator

10.7 Transformer

10.8 Motor

10.9 Bus Device

10.10 Electrical Secondary Circuit Connection

10.11 DC System Devices

10.12 Relay Protection,Electrical Measurement and Automatic Device

10.13 Grounding System

10.14 Project Acceptance

11 Water Treatment

11.1 General Requirements

11.2 Reverse Osmosis Device

11.3 Boiler Make-up Water Treatment

11.4 Sampling and Dosing System

11.5 Circulating Cooling Water Treatment

11.6 Tank

11.7 Rotating Machinery

11.8 Special Pipe and Valves

11.9 Anticorrosion Works

11.10 Startup and Commissioning

11.11 Chemical Supervision in Trial Operation of the Rmal Equipment

11.12 Project Acceptance

12 Construction Works

12.1 General Requirements

12.2 Foundation

12.3 Concrete Structure

12.4 Steel Structure

12.5 Equipment Foundation and Underground Channel

12.6 Construction measurement and Settlement Observation

12.7 Building Facilities

12.8 Project Acceptance

13 Heat-insulation and Paint

13.1 General Requirements

13.2 Heat-insulation of Equipment

13.3 Heat-insulation of Pipeline

13.4 Paint and Coatings

13.5 Project Acceptance

14 Commissioning and Acceptance of the Entire System

14.1 General Requirements

14.2 Subsection Commissioning

14.3 Startup of the Entire System

14.4 Completion Acceptance

Appendix A Construction Quality Acceptance Table of Waste Heat Power Generation Project

Appendix B Check list for Conditions of Subsystem Commissioning

Appendix C Signing Table of Equipment and System Custody

Appendix D Quality Acceptance Table of Subsystem Trial Operation

Appendix E Check List for Conditions of the Entire System Trial Operation

Appendix F Handover Certificate for Acceptance of Unit Start-up

Appendix G Quality Evaluation Table of the Entire System Trial Operation

Explanation of Wording in This Code

List of Quoted Standards

累计评论(0条) 0个书友正在讨论这本书 发表评论

发表评论

发表评论,分享你的想法吧!

买过这本书的人还买过

读了这本书的人还在读

回顶部