为你推荐
书名页
版权页
Announcement of the Ministry of Housing and Urban-Rural Development of the Peoples Republic of China
Foreword
1 General Provisions
2 Terms
2.0.1 Series cpacitor installation(SC)
2.0.2 Fixed series capacitor installation(FSC)
2.0.3 Thyristor controlled series capacitor installation(TCSC)
2.0.4 SC Platform
2.0.5 Metal-oxide varistor(MOV)
2.0.6 Spark gap(GAP)
2.0.7 Damping device
2.0.8 Optical fiber column
2.0.9 Thyristor valve
2.0.10 Thyristor-controlled reactor
2.0.11 Ion exchange equipment
2.0.12 Deionized water
2.0.13 Insulation water pipe
3 Basic Requirements
4 SC Platform
4.1 Pre-Installation Inspection
4.2 Installation and Adjustment of Insulators for SC Platform
4.3 Assembling of SC Platform
4.4 Hoisting and Adjustment of SC Platform
4.5 Installation of SC Platform Accessories
5 Electric Equipment Installation
5.1 General Requirements
5.2 Capacitor
5.3 Metal-Oxide Varistor(MOV)
5.4 Spark Gap(GAP)
5.5 Damping Device
5.6 Optical Fiber Column
5.7 Current Transformer(CT),By-Pass Switch and Disconnector
5.8 Control and Protection System
6 Equipment Installation Specific to TCSC
6.1 Thyristor-Controlled Reactor(TCR)
6.2 Thyristor Valve Chamber
6.3 Voltage Divider
6.4 Water Cooling System
7 Acceptance of SC Project
Explanation of Wording in This Code
List of Quoted Standards
Explanation of Provisions
Descriptions
1 General Provisions
2 Terms
3 Basic Requirements
4 SC Platform
4.1 Pre-Installation Inspection
4.3 Assembling of SC Platform
4.4 Hoisting and Adjustment of SC Platform
5 Electric Equipment Installation
5.2 Capacitor
5.3 Metal-Oxide Varistor(MOV)
5.4 Spark Gap(GAP)
5.6 Optical Fiber Column
5.8 Control and Protection System
6 Equipment Installation Specific to TCSC
6.2 Thyristor Valve Chamber
6.3 Voltage Divider
6.4 Water Cooling System
7 Acceptance of SC Project
买过这本书的人还买过
读了这本书的人还在读
同类图书排行榜