万本电子书0元读

万本电子书0元读

顶部广告

GB50967-2014焦化机械设备安装规范(英文版)电子书

售       价:¥

3人正在读 | 0人评论 9.8

作       者:中华人民共和国住房和城乡建设部

出  版  社:中国计划出版社

出版时间:2016-01-01

字       数:22.1万

所属分类: 科技 > 工业技术 > 其他

温馨提示:数字商品不支持退换货,不提供源文件,不支持导出打印

为你推荐

  • 读书简介
  • 目录
  • 累计评论(0条)
  • 读书简介
  • 目录
  • 累计评论(0条)
GB50967-2014焦化机械设备安装规范(英文版)
目录展开

书名页

版权页

Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China

Foreword

1 General Provisions

2 Basic Regulation

3 Equipment Foundation,Anchor Bolts and Shim Plates

3.1 Equipment Foundation

3.2 Datum Line and Datum Mark for Installation of Equipment

3.3 Anchor Bolts

3.4 Shim Plates

4 Equipment and Material

4.1 Equipment

4.2 Material

5 Material Stacker and Reclaimer

5.1 General Requirement

5.2 Installation of Walking Structure

5.3 Installation of Reversible Device

5.4 Installation of Cable Drum

5.5 Installation of Belt Conveyor,Balance Weight,Anchorage Locker

6 Protective Iron Parts and Operating Platform of Coke Oven

6.1 General Requirement

6.2 Installation of Buckstays

6.3 Installation of Small Buckstays

6.4 Installation of Protective Plates

6.5 Installation of Oven Port Frames and Nog Plates

6.6 Installation of Oven Ports

6.7 Installation of Longitudinal and Lateral Bracings

6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side

7 Heating and Exchange Device under the Coke Oven

7.1 Installation of Gas Main Pipelines,Branch Pipeline and Downspouts

7.2 Installation of Regulating Cock,Exchange Cock and Orifice Plate Box

7.3 Installation of Waste Gas Exchange Shutter

7.4 Installation of Gas Exchanger

7.5 Installation of Exchange Driving Structure

7.6 Installation of Stack Gate Valve

8 Equipment on the Top of Coke Oven

8.1 Installation of Gas Headers and Liquid Ammonia Pipes

8.2 Installation of Risers and Crossover Mains

8.3 Installation of Guide Pipes for Coke Guide and Coal Charging Dedusting

9 Auxiliary Equipment of Coke Oven

9.1 Installation of Test Equipment for Oven Port Repair Station,Coke Pushing Ram and Coal Leveling Bar

9.2 Installation of Collecting Plates of Wet Quenching Tower

9.3 Installation of Coal Feeding Device of Coal Tower

9.4 Installation of Scale for Coal Charger of Coal Tower

9.5 Installation of Rails of Coke Pusher,Coal Charger and Coke Car

9.6 Installation of Rails of Coke Guide

10 Coke Pusher

10.1 General Requirement

10.2 Installation of Walking Structure

10.3 Installation of Steel Structure

10.4 Installation of Coke Pushing Device

10.5 Installation of Port Extracting Device

10.6 Installation of Cleaning Device of Oven Port Frames

10.7 Installation of Cleaning Device of Oven Ports

10.8 Installation of Coal Leveling Device

10.9 Installation of Cleaning Device of Small Oven Ports

11 Coke Guide

11.1 General Requirement

11.2 Installation of Walking Structure

11.3 Installation of Steel Structure

11.4 Installation of Coke Guide Grill

11.5 Installation of Port Extracting Device

11.6 Installation of Cleaning Device of Oven Port Frames

11.7 Installation of Cleaning Device of Oven Ports

11.8 Installation of Coke Guide Dedusting Device

12 Coal Charger

12.1 General Requirement

12.2 Installation of Walking Device

12.3 Installation of Steel Structure

12.4 Installation of Coal Hopper

12.5 Installation of Coal Feeding Device

12.6 Installation of Cover Extracting Device

12.7 Installation of Shutters of Covers of Liquid Ammonia Exchange and Risers

12.8 Installation of Dedusting Device of Coal Charger

13 Coke Car,Electric Locomotive and Coke Tank Car

13.1 Installation of Coke Car

13.2 Installation of Electric Locomotive

13.3 Installation of Coke Tank Car

14 Process Steel Structure and Rails of Coke Dry Quench

14.1 General Requirement

14.2 Installation of Quenching Channel Steel Structure

14.3 Installation of Rails of Lifting Device

14.4 Installation of Guide Rails of Lifting Headframe

14.5 Installation of Rails of Maintenance Cranes

14.6 Installation of Cable Guide Frame of Lifting Device

15 Quenching Tank of COQ

15.1 Installation of Shell Body of Quenching Tank

15.2 Installation of Air Supply Device

16 Mechanical Equipment for Charging and Discharging System of COQ

16.1 Installation of Transverse Tracting Device

16.2 Installation of Lifting Device

16.3 Installation of Charging Device

16.4 Installation of Discharging Device

16.5 Installation of Automatic Para-position Device

17 Mechanical Equipment of Gas Circulating System of COQ

17.1 General Requirement

17.2 Installation of Primary Deduster

17.3 Installation of Secondary Deduster

17.4 Installation of Water Feeding Pre-heater

18 Auxiliary Equipment of COQ

18.1 General Requirement

18.2 Installation of Elevator Shaft

18.3 Installation of Demineralized Water Tank

19 Equipment of Gas Purification and Chemical Recovery

19.1 General Requirement

19.2 Assembly of Tower Equipment

19.3 Site Welding of Tower Equipment

19.4 Installation of Tower Equipment

19.5 Installation of Parts of Tower Equipment

19.6 Assembly of Vessel Equipment

19.7 Site Welding of Vessel Equipment

19.8 Installation of Vessel Equipment

19.9 Installation of Tank Equipment

19.10 Welding of Tank Equipment

19.11 Installation of Heat-exchange Equipment

19.12 Installation of Mechanical Sedimentation Tank

19.13 Iinstallation of Centrifugal Separator

19.14 Installation of Gas Primary and Final Cooler

19.15 Installation of Electrical Tar Skimmer

19.16 Installation of Saturator

19.17 Installation of Pipe-type Heating Furnace

19.18 Installation of Rotary Drum Crystallizer

19.19 Installation of Naphthalene Refiner

19.20 Installation of Material Charger

19.21 Installation of Quantitative Barrel Filler

19.22 Installation of Pelleter

20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven

20.1 General Requirement

20.2 Test-run of Material Stacker and Reclaimer

20.3 Test-run of Mechanial Equipment of Coke Oven

20.4 Test-run of Moving Mechanical Equipment

20.5 Test-run of Dry Quenching Unit

20.6 Test-run of Gas Purification and Chemical Recovery Unit

20.7 Thermal-state Operation of Coke Oven

Explanation of Wording in This Code

List of Quoted Standards

Explanation of Provisions

Explanation of Provisions Development

1 General Provisions

2 Basic Regulation

3 Equipment Foundation,Anchor Bolts and Shim Plates

3.1 Equipment Foundation

3.2 Datum Line and Datum Mark for Installation of Equipment

3.3 Anchor Bolts

4 Equipment and Material

4.2 Material

6 Protective Iron Parts and Operating Platform of Coke Oven

6.1 General Requirement

6.4 Installation of Protective Plates

6.5 Installation of Oven Port Frames and Nog Plate

6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side

8 Equipment on the Top of Coke Oven

8.1 Installation of Gas Headers and Liquid Ammonia Pipes

14 Process Steel Structure and Rails of Coke Dry Quench

14.2 Installation of Quenching Channel Steel Structure

14.4 Installation of Guide Rails of Lifting Headframe

15 Quenching Tank of COQ

15.1 Installation of Shell Body of Quenching Tank

15.2 Installation of Air Supply Device

16 Mechanical Equipment for Charging and Discharging System of COQ

16.1 Installation of Transverse Tracting Device

16.2 Installation of Lifting Device

16.3 Installation of Charging Device

16.4 Installation of Discharging Device

17 Mechanical Equipment of Gas Circulating System of COQ

17.1 General Requirement

17.2 Installation of Primary Deduster

17.3 Installation of Secondary Deduster

18 Auxiliary Equipment of COQ

18.2 Installation of Elevator Shaft

18.3 Installation of Demineralized Water Tank

19 Equipment of Gas Purification and Chemical Recovery

19.1 General Requirement

19.2 Assembly of Tower Equipment

19.3 Site Welding of Tower Equipment

19.4 Installation of Tower Equipment

19.6 Assembly of Vessel Equipment

19.7 Site Welding of Vessel Equipment

19.8 Installation of Vessel Equipment

19.10 Welding of Tank Equipment

19.12 Installation of Mechanical Sedimentation Tank

20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven

20.1 General Requirement

累计评论(0条) 0个书友正在讨论这本书 发表评论

发表评论

发表评论,分享你的想法吧!

买过这本书的人还买过

读了这本书的人还在读

回顶部