Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Basic Regulation
3 Equipment Foundation,Anchor Bolts and Shim Plates
3.1 Equipment Foundation
3.2 Datum Line and Datum Mark for Installation of Equipment
3.3 Anchor Bolts
3.4 Shim Plates
4 Equipment and Material
4.1 Equipment
4.2 Material
5 Material Stacker and Reclaimer
5.1 General Requirement
5.2 Installation of Walking Structure
5.3 Installation of Reversible Device
5.4 Installation of Cable Drum
5.5 Installation of Belt Conveyor,Balance Weight,Anchorage Locker
6 Protective Iron Parts and Operating Platform of Coke Oven
6.1 General Requirement
6.2 Installation of Buckstays
6.3 Installation of Small Buckstays
6.4 Installation of Protective Plates
6.5 Installation of Oven Port Frames and Nog Plates
6.6 Installation of Oven Ports
6.7 Installation of Longitudinal and Lateral Bracings
6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side
7 Heating and Exchange Device under the Coke Oven
7.1 Installation of Gas Main Pipelines,Branch Pipeline and Downspouts
7.2 Installation of Regulating Cock,Exchange Cock and Orifice Plate Box
7.3 Installation of Waste Gas Exchange Shutter
7.4 Installation of Gas Exchanger
7.5 Installation of Exchange Driving Structure
7.6 Installation of Stack Gate Valve
8 Equipment on the Top of Coke Oven
8.1 Installation of Gas Headers and Liquid Ammonia Pipes
8.2 Installation of Risers and Crossover Mains
8.3 Installation of Guide Pipes for Coke Guide and Coal Charging Dedusting
9 Auxiliary Equipment of Coke Oven
9.1 Installation of Test Equipment for Oven Port Repair Station,Coke Pushing Ram and Coal Leveling Bar
9.2 Installation of Collecting Plates of Wet Quenching Tower
9.3 Installation of Coal Feeding Device of Coal Tower
9.4 Installation of Scale for Coal Charger of Coal Tower
9.5 Installation of Rails of Coke Pusher,Coal Charger and Coke Car
9.6 Installation of Rails of Coke Guide
10 Coke Pusher
10.1 General Requirement
10.2 Installation of Walking Structure
10.3 Installation of Steel Structure
10.4 Installation of Coke Pushing Device
10.5 Installation of Port Extracting Device
10.6 Installation of Cleaning Device of Oven Port Frames
10.7 Installation of Cleaning Device of Oven Ports
10.8 Installation of Coal Leveling Device
10.9 Installation of Cleaning Device of Small Oven Ports
11 Coke Guide
11.1 General Requirement
11.2 Installation of Walking Structure
11.3 Installation of Steel Structure
11.4 Installation of Coke Guide Grill
11.5 Installation of Port Extracting Device
11.6 Installation of Cleaning Device of Oven Port Frames
11.7 Installation of Cleaning Device of Oven Ports
11.8 Installation of Coke Guide Dedusting Device
12 Coal Charger
12.1 General Requirement
12.2 Installation of Walking Device
12.3 Installation of Steel Structure
12.4 Installation of Coal Hopper
12.5 Installation of Coal Feeding Device
12.6 Installation of Cover Extracting Device
12.7 Installation of Shutters of Covers of Liquid Ammonia Exchange and Risers
12.8 Installation of Dedusting Device of Coal Charger
13 Coke Car,Electric Locomotive and Coke Tank Car
13.1 Installation of Coke Car
13.2 Installation of Electric Locomotive
13.3 Installation of Coke Tank Car
14 Process Steel Structure and Rails of Coke Dry Quench
14.1 General Requirement
14.2 Installation of Quenching Channel Steel Structure
14.3 Installation of Rails of Lifting Device
14.4 Installation of Guide Rails of Lifting Headframe
14.5 Installation of Rails of Maintenance Cranes
14.6 Installation of Cable Guide Frame of Lifting Device
15 Quenching Tank of COQ
15.1 Installation of Shell Body of Quenching Tank
15.2 Installation of Air Supply Device
16 Mechanical Equipment for Charging and Discharging System of COQ
16.1 Installation of Transverse Tracting Device
16.2 Installation of Lifting Device
16.3 Installation of Charging Device
16.4 Installation of Discharging Device
16.5 Installation of Automatic Para-position Device
17 Mechanical Equipment of Gas Circulating System of COQ
17.1 General Requirement
17.2 Installation of Primary Deduster
17.3 Installation of Secondary Deduster
17.4 Installation of Water Feeding Pre-heater
18 Auxiliary Equipment of COQ
18.1 General Requirement
18.2 Installation of Elevator Shaft
18.3 Installation of Demineralized Water Tank
19 Equipment of Gas Purification and Chemical Recovery
19.1 General Requirement
19.2 Assembly of Tower Equipment
19.3 Site Welding of Tower Equipment
19.4 Installation of Tower Equipment
19.5 Installation of Parts of Tower Equipment
19.6 Assembly of Vessel Equipment
19.7 Site Welding of Vessel Equipment
19.8 Installation of Vessel Equipment
19.9 Installation of Tank Equipment
19.10 Welding of Tank Equipment
19.11 Installation of Heat-exchange Equipment
19.12 Installation of Mechanical Sedimentation Tank
19.13 Iinstallation of Centrifugal Separator
19.14 Installation of Gas Primary and Final Cooler
19.15 Installation of Electrical Tar Skimmer
19.16 Installation of Saturator
19.17 Installation of Pipe-type Heating Furnace
19.18 Installation of Rotary Drum Crystallizer
19.19 Installation of Naphthalene Refiner
19.20 Installation of Material Charger
19.21 Installation of Quantitative Barrel Filler
19.22 Installation of Pelleter
20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven
20.1 General Requirement
20.2 Test-run of Material Stacker and Reclaimer
20.3 Test-run of Mechanial Equipment of Coke Oven
20.4 Test-run of Moving Mechanical Equipment
20.5 Test-run of Dry Quenching Unit
20.6 Test-run of Gas Purification and Chemical Recovery Unit
20.7 Thermal-state Operation of Coke Oven
Explanation of Wording in This Code
List of Quoted Standards
Explanation of Provisions
Explanation of Provisions Development
1 General Provisions
2 Basic Regulation
3 Equipment Foundation,Anchor Bolts and Shim Plates
3.1 Equipment Foundation
3.2 Datum Line and Datum Mark for Installation of Equipment
3.3 Anchor Bolts
4 Equipment and Material
4.2 Material
6 Protective Iron Parts and Operating Platform of Coke Oven
6.1 General Requirement
6.4 Installation of Protective Plates
6.5 Installation of Oven Port Frames and Nog Plate
6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side
8 Equipment on the Top of Coke Oven
8.1 Installation of Gas Headers and Liquid Ammonia Pipes
14 Process Steel Structure and Rails of Coke Dry Quench
14.2 Installation of Quenching Channel Steel Structure
14.4 Installation of Guide Rails of Lifting Headframe
15 Quenching Tank of COQ
15.1 Installation of Shell Body of Quenching Tank
15.2 Installation of Air Supply Device
16 Mechanical Equipment for Charging and Discharging System of COQ
16.1 Installation of Transverse Tracting Device
16.2 Installation of Lifting Device
16.3 Installation of Charging Device
16.4 Installation of Discharging Device
17 Mechanical Equipment of Gas Circulating System of COQ
17.1 General Requirement
17.2 Installation of Primary Deduster
17.3 Installation of Secondary Deduster
18 Auxiliary Equipment of COQ
18.2 Installation of Elevator Shaft
18.3 Installation of Demineralized Water Tank
19 Equipment of Gas Purification and Chemical Recovery
19.1 General Requirement
19.2 Assembly of Tower Equipment
19.3 Site Welding of Tower Equipment
19.4 Installation of Tower Equipment
19.6 Assembly of Vessel Equipment
19.7 Site Welding of Vessel Equipment
19.8 Installation of Vessel Equipment
19.10 Welding of Tank Equipment
19.12 Installation of Mechanical Sedimentation Tank
20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven
20.1 General Requirement